A house of a dasane log of 224.6 m2 with a nationery floor: a combination of differentifactore materials brings modern sound to the interior
Traditional Russian hut is a grateful source of inspiration for modern designers. Moreover, the tradition often intertwined with modernity, so that new interesting forms and original decorative solutions are born. The house that will be discussed is an example of such a synthesis.
In the country village with the fabulous name "Berendevo Kingdom", which is located near the city of Boltensk, the atmosphere is really fabulous. Not only, he is located in the middle of the real forest, near the river and at home here everything is on the selection of logs, with a stone base and an intricate roof. This is no accident: this is an indispensable condition for all the local owners of land plots, the correspondence of the residential structure of the traditional wooden Russian house. Now it should be noted that each construction due to either an interesting decoration, or an unusual constructive solution is endowed with its own features.
It is here that the house is located about which we want to tell. In addition, his hosts, a married couple with two children, acquired a plot in the village, on which the log house was already standing in size 128m. This building with the attic floor and the veranda was quite suitable for a summer family holiday. The main part of the first floor was occupied by a spacious fireplace living room, a kitchen with a stove was adjacent to it. Three rooms in the attic steel bedrooms.
However, after some time, more and more in love with this place, surprisingly beautiful, new owners decided to expand and landscaping the house so that you could come here with the whole family not only for the period of summer holidays and holidays, but also throughout the year, yes also invite friends to picnics and fishing. This goal was decided to make an adjoint to two sides of the house (end and longitudinal) one-story extension, in which there were accommodated rooms and a home theater zone. Above part of the extension, extinguishing the roof of the old house, conceived to organize a spacious indoor terrace.
Interesting detail
Decorative decoration at home complement forged details
Today the house looks like a single whole, so it is even difficult to imagine that once he was 2 times less than the current one. As the effect managed to achieve due to not only a well-thought-out constructive solution, but also a number of decorative techniques. Forward the queue to hide the difference in the color of darmest old and new, brighter log walls, they were covered by the protective Towering Makeup of Pinotex (Finland), giving a tree a spectacular dark brown color and simultaneously securing antiseptic and fire protection. In addition, the owner of the house came up with an interesting detail, with which it was possible to literally transform the appearance of the house. He proposed to be used as decorative linings spotted in half and peeled wood trunks with bitch left on them with a length of 10-15 cm. It was not necessary to look for such a material for a long time, he was at hand - there were several dry trees on the plot, which went into the case. The massive wooden parts thus obtained are horizontally at the bottom of the frontones. Smaller elements were decorated with windows and roofs of roofs.
Union of Old and New
Under the old building, the foundation is a monolithic reinforced concrete belt type, beugoned by 1.4m. The height of the baseway is 0.8m here. Under the attached part, the same monolithic belt foundation is 1,4 m depth. Avot The height of the base due to the slope of the soil on the site turned out to be much bigger, it comes to 2m. (Such a foundation height of the house allowed to equip a full-fledged corner balcony to which there is a yield from the master bedroom.) Outside the base is lined with a butte stone. A layer of waterproofing (rubberoid) is laid between the concrete base and the log-wall.The walls of the old house are erected from dasane logs. New log walls are dug to its longitudinal part. Moreover, they specifically purchased the winter Arkhangelsky forest with good performance characteristics. A part of an extension adjacent to the end of the house is otherwise performed: its walls are made of concrete blocks. This decision is due not only to the desire to use materials in the design of the facades of various textures, but also a constructive necessity. The fact is that it is above this room a covered terrace, the weight of the overlap of which, together with the weight of the roof, protecting it from the rain and snow, and take on concrete walls.
Walls made of concrete blocks are insulated from the inside of the building using Rockwool mineral wool (Denmark) thickness 100mm. The insulation is protected from moisture evaporation by a layer of film vapor barrier. From the side of the inner premises of the walls are sewn with plasterboard and painted with water-dispersion paint, and on the side of the street they are plastered and partially lined with a tumor, as if pesting the stucco layer.
Overlap in wooden house. The sloping roof of the complex shape has a rafter design with wooden rafters. The insulation of the roof is made using Rockwool mineral wool (150mm). Punching of roofing material used metal tile (Finland).
Mechanics of heat
The construction is heated mainly by electricity: wall-mounted electrical radiators are installed in residential premises. In the case of electricity interruptions in the estate there is a Wilson diesel generator (United Kingdom). In a vacuum, when gas will be carried out in the country village, it is planned to equip the heating system with a two-circuit gas boiler. The price of a good help in heating at home is a furnace and a fireplace, the heat of which is enough to maintain a comfortable temperature in the living room area.
For hot water, the electrical boilers Thermex (Italy) is used. Two of them, 100 liters, are located in a bathroom and kitchen, and the third, for 200 liters, installed in the bathroom. Water is served from the well located directly at the wall at home with a submersible pump. Moreover, the distance from the house to the well tried to make minimal to reduce the length of the water pipes, laid underground, and thereby reduce the risk of freezing water in the winter period. A thermokabel is connected to the pipes to the pipes, which, with a decrease in temperature below the critical mark, automatically turns on the electrically heating system.
Planning
To get to the house, you must first climb the stone steps to a wooden porch, from where you can go to the veranda. This part of the house does not heal and is intended for use in the warm season. On the veranda there is a staircase leading to the attic where guest rooms are located. In winter, they are also most often empty, while remaining a "cold" zone, especially since there is a guest house-bath guest house.
Sveranda and in the warm part of the house. The leading door is opened in a small tambour; To the right of it is located a bathroom, and directly opposite the door-entrance to the living room. The living room is adjacent to a small kitchen separated by a partition, on one side of which a fireplace facing the living room is located, and on the other, the stove, which is already in the kitchen. The furnace and the fireplace have a combined chimney. From the living room, you can go to the home theater zone, as well as in the hall, where the doors of the bedroom, children's and bathroom overlook.
Wall on the wall
The ceiling in the living room area is decorated with plasterboard raised balks, on which compact directional light fixtures are fixed, and the entire wiring is hidden in a plasterboard box
When erecting an extension, builders had to take into account the difference between the temperature deformation of the building materials, of which new walls were erected - wood and concrete. To compensate for this difference in places of docking of log and concrete walls, a special seam made, allowing them as the shrinkage and deformations "walk" relative to each other. So that the seam was not noticeable, it was covered with an ornamental wooden plank from the outside. Before proceeding with the final stage of the construction of the house and its finishing, the wooden extension was given to stand over 2 years. All this time, the family had a wonderful opportunity to relax in the dirty in the already finished part of the building. After the required period in the walls of the hut, the input openings, which connected it with new premises were abandoned. Since there are not one in the bearing wall between the living room and the home theater zone, and the integer two passages, the central simpleness had to strengthen. To increase its stability, mounted a frame structure from a monolithic reinforced concrete. It was trimmed with drywall and decorated with light wooden shelves, as a result of which it began to be perceived not as much as a structural part, as like a decorative rack located on the border of two zones.
Modern hut
In the interior decoration, the owners of the house wanted to move away from the type of Russian huts in the traditional representation, make premises with lighter and modern. For help turned to professional designer.
To soften the brutality of the dazon log, the wooden walls inside the house decided to trim the block mobile. Thanks to this reception, the feeling of a log laying is preserved, at the same time the walls are light and have a smooth smooth surface. In addition to the blockhas, drywall is used in the wall decoration, which are sewn interior partitions. It is painted in soft pastel tones of olive gamut, well combined with natural wood color. The ceiling is laid by clapboard, and in the living room zone is decorated with rands made from drywall. Floor coating in almost all rooms is Egger (Germany) laminate. The exclusion is the bathroom, bathroom, as well as the kitchen area, where the ceramic tile is laid on the floor. Such a combination of differentifactore materials and drywall, laminate and ceramics, introduces modern sound to the interior, but at the same time the charm and dignity of the wooden log cabin are preserved.
Floor plan | Plan of the second floor |
Explanation of the first floor
1. Veranda - 27.3m2
2. Corridor - 3,3m2
3. Living room - 37m2
4. Kitchen - 6.9M2
5. Home Cinema - 22.3m2
6. Hall - 8,5m2
7. Bedroom - 20,3m2
8. Children's- 23,5m2
9. Bathroom - 8.2m2
10. Bathroom - 2,3m2
11. Balcony 6m2.
Explanation of the second floor
1. Bedroom - 22.9M2
2. Children's- 14,6m2
3. Guestfully - 9.9M2
4. Terrace - 15,2m2
Technical data
The total area of the house (taking into account the unheated premises) - 224, 6m2
The area of heated premises - 179.7M2
Designs
Building type: Wooden, Part - from concrete blocks
Foundation: Monolithic reinforced concrete belt type, depth - 1.4m, Clapping stone
Walls: Tesana log, Inner covering - blockhaus, drywall; Partially concrete blocks with internal insulation mineral wool Rockwool (100mm)
Overlapping: Wooden Boy
Roof: Scope, Stropyl design, Wooden rafters, Steam barrier film, WATT-MINERAL WATT ROCKWOOL (150mm), wind insulation; roofing metal
Windows: plastic with double-chamber windows
Life support systems
Power Supply: Municipal Network, Wilson Diesel Generator
Water Supply: Well, Clean Pump
Sewerage: Septic tank, filter well
Heating: Electric radiators, fireplace, furnace
Hot Water Supply: Three Thermex Boiler
Additional systems
Fireplace: Masonry
Interior decoration
Walls: Blockchaus, Plasterboard, Plaster, Paint
Floors: Egger Laminate, Ceramic Tile
Ceilings: Pine Lining
Stairs: larch
FURNITURE: ALBERT SHTEIN (Russia), to order
The enlarged calculation of the cost * construction of the house with a total area of 224, 6 m2, similar to the submitted
Name of works | Number of | price, rub. | Cost, rub. |
---|---|---|---|
Foundation work | |||
Development and garbage | 71m3 | 780. | 55 380. |
Sand base device, rubble | 12m3 | 240. | 2880. |
The structure of the foundation of the belt | 53m3 | 4200. | 222 600. |
Waterproofing horizontal and lateral | 250m3 | 430. | 107 500. |
Other works | - | - | 43 700. |
TOTAL | 432060. | ||
Applied materials on the section | |||
Concrete heavy | 53m3 | 3100. | 164 300. |
Crushed stone granite, sand | 12m3 | - | 14 400. |
Ruberoid, Bituminous Mastic | 250m3 | - | 45,000 |
Armature, formwork shields, etc. | set | - | 52 500. |
TOTAL | 276200. | ||
Walls, partitions, overlap, roofing | |||
Preparatory work, installation and dismantling of scaffolding | set | - | 9800. |
Cutting walls and partitions from logs | 48m3. | 3700. | 177 600. |
Laying of outdoor walls and partitions from blocks | 23m3 | 1800. | 41 400. |
Build overlap with laying beams | 225m3 | 490. | 110 250. |
Assembling roof elements with clamp | 310m3. | 570. | 176 700. |
Hydro- and thermal insulation of walls, overlaps | 530m3 | 70. | 37 100. |
Hydro and vaporizoation device | 530m3 | fifty | 26 500. |
Cabinet Veranda, Porks | set | - | 43 100. |
Metal coating device | 310m3. | 320. | 99 200. |
Eaves Bearing, Svezov | set | - | 12 300. |
Filling the openings by window blocks | set | - | 39 200. |
Other works | set | - | 35,000 |
TOTAL | 808150. | ||
Applied materials on the section | |||
Log construction | 48m3. | 5900. | 283 200. |
Sawn timber | 27m3. | 5100 | 137 700. |
Interwidden insulation, bent, fasteners | set | - | 24,000 |
Block from cellular concrete | 23m3 | 2800. | 64 400. |
Masonry heavy solution | 3.9m3 | 1800. | 7020. |
Steam, wind and waterproof films | 530m3 | - | 18 600. |
Mineral wool insulation | 530m3 | - | 59 400. |
Metal profiled sheet, Dobornye elements | 310m3. | - | 189 100. |
Drainage system (tube, chute, knee, clamps) | set | - | 17 600. |
Plastic window blocks with double-glazed windows | set | - | 147,000 |
Other materials | set | - | 40 500. |
TOTAL | 988520. | ||
Engineering systems | |||
Installation of wastewater treatment system | set | - | 28,000 |
Autonomous water supply device | set | - | 39 800. |
Device fireplace | set | - | 75 400. |
Electrical and plumbing work | set | - | 189,000 |
TOTAL | 332200. | ||
Applied materials on the section | |||
Local sewage system | set | - | 59 800. |
Autonomous Water Supply System | set | - | 43 500. |
Fireplace (brick, facing, components) | set | - | 116,000 |
Plumbing and electrical equipment | set | - | 245,000 |
TOTAL | 464300. | ||
FINISHING WORK | |||
Ceiling liner lining | 270m3. | 340. | 91 800. |
Antisepting ready-made compositions | set | - | 65 700. |
Laminate coatings | 210m3. | 390. | 81 900. |
Facing, plastering, assembly and joinery | set | - | 494 600. |
TOTAL | 734000. | ||
Applied materials on the section | |||
Laminate, Plinth | set | - | 158,000 |
Food-protecting compositions and varnishes | set | - | 26 000 |
Lining, Plasterboard, Blockchaus, Staircase, Decorative Stone, Ceramic Tile, Door Blocks and Other Materials | set | - | 1,336,000 |
TOTAL | 1520000. | ||
* - the calculation is made on the averaged rates of construction firms of Moscow without making the coefficients |