Good forget old

Anonim

Two-bedroom apartment with an area of ​​60 m2 in the House of Construction of the 30s. XX century: the problem of low doors against the background of high walls was solved by arched openings.

Good forget old 13209_1

Good forget old
The first impression of the apartment is in the hallway, where the unusual designs of the hangers and the miniature table Rude Bravo give a feeling of speaking
Good forget old
Living room area, hallway and kitchens are combined with high arched openings and floor patterns laid out by Gazzotti Parquet Board
Good forget old
The setting of a small living room make up the original coffee table, sofa and Nube chair
Good forget old
Arched openings appeared in support of a semicircular niche between wide carrier columns
Good forget old
Due to the high legs of the kitchen headset and elegant chandelier, small space of the kitchen has gained ease
Good forget old
Go to the former once a communal kitchen Now you can only from the living room.
Good forget old
The dining area is highlighted by the color of the floor covering. Twin placed table console and Luciano Zonta chairs

Good forget old

Good forget old
Wall panel over the bed in the bedroom is made of plaster to order. It is impressive carefulness of each petal.
Good forget old
In the decoration of the bathroom used source selected materials from different collections of ceramic tiles and mosaics
Good forget old
With greenish-golden ornament Mosaic combined Regia sink from gas glass
Good forget old
Plan before reorganization
Good forget old
Plan after reorganization

They say that they used to build on the century. Ito is quite fair. However, technology stepped far ahead, respectively, some constructive decisions of the past are outdated. The same lifestyle and ideas about comfortable accommodation at a modern person are completely different than in previous generations. Therefore, those who acquire an apartment in the old residential foundation should be remembered that without redevelopment, it is most likely not to do, and repair will have its own specifics and will require additional material costs.

When Igor bought an apartment in a building erected into the Soviet period, in 30-kgg. XXV., He assumed that it would face a number of inconvenience due to the specifics of the construction of the time. But the house located in a quiet center of Moscow, which stores memories of the interesting fate of the former tenants, the abundance of greenery in the yard inspired him that the minuses became not counting.

80 years later

In the apartment, for many years served by communal, all the premises were isolated. In moretime, such a layout seems inappropriate, especially if you consider that the owner involves living alone. Therefore, in front of the architect of Irina Kachmazova, a task got up: from the "set" of small rooms to make a comfortable, modern and extraordinary accommodated housing.

But to redo the space managed only in part, due to the fact that the walls between the two living rooms, as well as the room and the kitchen are carriers. It is the same with the arrangement of the representative zone in the wall between the small kitchen (8m2) and the living room had to do the opening and enhance it with the help of metal structures. Two carrier columns with a thickness of about 0.5M were separated from the hallway from the corridor from which it was possible to get into the room, separate bathroom and kitchen. In order not to spend the area on the passing zones and equip the spacious bathroom, as the owner wanted, the door was installed between the columns, and the passage to the kitchen was laid. Go there now it became possible only from the living room. But in this way, it was possible to carve a fairly significant space for the combined bathroom (almost 7m2) and install the impressive size bath (1,91,2m) (Hoesch, Germany). Water supply and sewage risers were hidden behind the design of plasterboard. A wide lower part has placed the installation system for the suspension toilet, which made a niche for toiletries.

The opening on the right, leading from the reunited bathroom in the residential room, left in the same place. We placed the wardrobe and installed a sports simulator. Under the bedroom, the most spacious room was taken to the right of the entrance to the apartment.

The design of the old floor

Feature home- Wooden interhesive floors. Inside them pass ventilation channels. Such a design has long considered unsuccessful. Fire alvrice Flame will quickly spread through overlaps, since the ventilation moves provide traction, and the tree is perfectly burning. When the old parquet was removed, it turned out that wooden structures were well preserved. Avat The base of parquet flooring from boards, backing from slag waste and construction debris between the lags had to be removed. Lags were also in a satisfactory condition, because the tree under favorable operating conditions can serve 200 years and more. They only put them in the level and secured by the mounting dowels under the gun, and where it was necessary, leveled. The space between the lags was covered with clay. Down, under lags, beds polyethylene film, and from above made vaporizolation. There were two layers of plywood as a base, two layers of plywood were planned to lay the hallways and hallway. In order to give the base additional rigidity, the sheets began to lay in such a way that the seams of the upper and lower layers do not coincide. According to the same principle in the bathroom and the kitchen, there was a base for ceramic tiles, but not from plywood, but from dry-fiber sheets (GVLV).

Height requires the victims

High ceiling - the dignity of old houses- seemed inappropriate in small rooms. So, the bathroom with a size of 3.12,2m with a height of 3,2m reminded the well. Therefore, the ceiling level is lowered here using a two-level design of plasterboard on a metal frame. The lower stage of the ceiling forms a wide range around the perimeter of the room. It was mounted outside the floating light from fluorescent lamps. There is a ventilation box along the edge of the ceiling, which smoothes the perception of the "wrong" cube, and there the height remained the same. Botty and hallway, the volumes beat with eaves from polyurethane, which are quite simple to use; They glue them to "liquid nails" or another building glue. Correspondies fastened around the perimeter of the room at a distance of 0.2 m from the ceiling. Behind them hid the cornice backlight. The stamped ceiling made of plasterboard on a metal frame.

Wind from the East

Good forget old

Good forget old

The most original room in the apartment has become a bedroom. The owner did not want to wake up, see the white cloth of the ceiling, and the architect suggested to build a canopier over the bed, turning into curtains. An unusual thought element was not very complicated. On the ceiling, the level of which is lowered by drywall on a metal frame, a round niche is made. Inside its drapery, fluorescent lamps are hidden, giving soft muffled light. Niche drapery is made of yellowish-brown organza. The center of Plafon-Baldakhina is suspended on the hook, and the edges are kept on the sticky tape, which was glued to a false-brake along the edge of the niche. For mounting curtains and drapets, running from the window to the ceiling, used flexible eaves made by special order. A favorable microclimate in the bedroom, as in the entire apartment, is maintained by air conditioning.

But against the background of high walls, standard doors would still seem too low. The situation was corrected by performing arched openings. The inner aisle from the living room in the kitchen enhanced construction was installed under the most ceiling and laid the arcuate overlap of the brick. The unbearable partitions, separating the living room and the bedroom from the hallway, were frame, trimmed with boards and duncut with a thick layer of lime-based plaster. During the long years, the plaster came into disrepair from slapping the doors, drivening nails and other vibrations, and it was cracked, and the places just sat down. Leave such partitions did not make sense. They were replaced by plasterboard walls on a metal frame, in which it was not difficult to establish arched openings. Puzzle blocks and even lighter foam blocks in this case were undesirable due to a significant load, which would have come on wooden floors.

High ceilings and arched openings needed to support in the design of the walls. They were separated by decorative plaster Caravaggio (Spiver, Italy), combining the properties of Venetian plaster and elegance and softness characteristic of velor.

The main steps of air conditioning installation

Good forget old

Good forget old

Good forget old

Good forget old

Good forget old

The indoor unit of the air conditioner is fixed to the wall using the mounting plate, the horizontal position of which is exhibited by level. Next to the plate perforator drill through a hole, collecting dust with a vacuum cleaner (s). From the side of the facade, the mountaineer sets the mounting device, the outer block, displays copper pipelines, concludes them into isolation (b). The internal block is connected to the outer through pipelines and electrical wiring (B). Initially, the air conditioner already ordered Freon. At the stage of installation of inter-block communications, the plugs are removed and the pipelines are connected (g). Breakfasts produce diagnostics of the correctness of the connection (D).

Performing such a type of finish is quite laborious. First prepare the basis for the coating: one layer of the fixer and two layers of a special base coating are applied. Then the first layer of material is superimposed (with a spatula of stainless steel or velor roller). After drying, after 24 hours, they put the second layer smears, so that the unfilled areas remain between them. Before the material is dry, it should be thoroughly smoothed to get different lighting effects.

Cost of preparatory and installation work

Type of work Scope of work Rate, rub. Cost, rub.
Dismantling and preparatory work - - 62 700.
Device of plasterboard partitions 27m2 - 13 500.
Installation of plasterboard structures - - 39 400.
Employ device (with metal) - - 16 400.
Loading and removal of construction trash 4 containers - 17 200.
TOTAL 149200.

Cost of materials for installation work

Name number price, rub. Cost, rub.
Steel rental, consumables set - 6400.
Plasterboard sheet, profile, screw, ox ribbon, sound insulation plate set - 19 200.
Polypropylene bag for construction waste 90 pcs. 10 900.
TOTAL 26500.

Cost of work on the device of floors

Type of work Scope of work Rate, rub. Cost, rub.
Repair Lag. set - 13 500.
Hydro and vaporizoation device 60m2. fifty 3000.
Heat and sound insulation device 60m2. 80. 4800.
Founding device from plywood, GVLV 60m2. 190. 11 400.
Installation of flooring coatings 49m2. 350. 17 150.
Corroduce coating device 11m2 590. 6490.
TOTAL 56340.

Cost of materials for flooring device

Name number price, rub. Cost, rub.
Paro- and hydraulic films 120m2. - 3600.
Ceramzit (bag 32kg) 80 pcs. 75. 6000.
Plywood, gvv 120m2. - 28,000
Parquet board 49m2. 1600. 78 400.
Porcelain stonework, glue tiled - - 12 400.
TOTAL 128400.

The cost of finishing work

Type of work Scope of work Rate, rub. Cost, rub.
Watching surfaces 190m2. - 69 200.
Application of decorative coating 220m2. - 110 800.
Wall facing tiles, mosaic 29m2. - 23 400.
Installation of robust polyurethane parts 27 pose M. 84. 2270.
Carpentry, carpentry work - - 29 800.
TOTAL 235470.

The cost of materials for the production of finishing works

Name number price, rub. Cost, rub.
Plaster Gypsum, Soil, Putclone set - 16 800.
Decorative coating Caravaggio. set - 68 800.
Ceramic tile, mosaic 29m2. - 39 400.
Ceiling polyurethane eaves 27 pose M. fifty 1350.
Glue tile, mix for grouting seams 235kg - 4900.
TOTAL 131250.

Cost of sanitary work

Type of work Scope of work Rate, rub. Cost, rub.
Laying water supply pipelines 39 pog. M. 180. 7020.
Laying of sewage pipelines 17 pog. M. - 2040.
Collector installation, filter set 2800. 2900.
Installation of Santechniborov set - 13 300.
TOTAL 25260.

Cost of plumbing materials and installation devices

Name number price, rub. Cost, rub.
Metal Pipes (Germany) 39 pog. M. - 2750.
Pipes sewer PVC 17 pog. M. - 2400.
Distributors, Filters, Fittings set - 18 900.
Plumbing set - 153 200.
TOTAL 177250.

The editors thanks the company "Euroclimate" for help in the preparation of material.

The editors warns that in accordance with the Housing Code of the Russian Federation, the coordination of the conducted reorganization and redevelopment is required.

Good forget old 13209_22

Architect: Irina Kachmazova

Watch overpower

Read more