House-garage

Anonim

The combined construction of 177 m2 on the territory of the estate in Latvia is simultaneously a guest house, a garage and a mini-substation.

House-garage 13216_1

House-garage

House-garage

House-garage
The garage room is equipped with a rolled gate that can be omitted in case of bad weather. Most often they are used in autumn and winter
House-garage
The roof is covered by the roof gives the construction of a real rural house in the National Tradition
House-garage
The structure of the arched army allows you to increase the level of overlap, thus increases the useful area of ​​the room. Incarnate Arca Lugana is also an architectural dominant that helps to highlight the living room area and create a light cozy corner overlooking the river landscape there. Alestal area thanks to the window can serve a miniature terrace
House-garage
Wooden stairs of the staircase from the pine massif are fixed on a metal welded Koser
House-garage
Easy wicker furniture, creating a relaxed country atmosphere, is a successful find for small rooms of the guest house
House-garage
Since the attic floor does not have carrier inland partitions, wooden supports that make part of the roof weight are installed here.

House-garage

House-garage
Floor plan
House-garage
Plan of the second floor

The enlarged calculation of the cost * construction of the house with a total area of ​​177m2, similar to the submitted

Name of works Number of price, rub. Cost, rub.
Preparatory and Foundation Works
Development and garbage 67m3 450. 30 150.
Sand base device, rubble 25m3. 220. 5500.
Device foundations of reinforced concrete 28m3. 2900. 81 200.
Device plates of reinforced concrete 36m3. 2400. 86 400.
Waterproofing horizontal and lateral 134m2. 160. 21 440.
Other works set - 11 900.
TOTAL 236 590.
Applied materials on the section
Concrete heavy 28m3. 3100. 86 800.
Crushed stone granite, sand 25m3. 1100. 27 500.
Hydrosteclozol, Bituminous Mastic 134m2. - 9400.
Armature, Formwork Shields and Other Materials set - 23 400.
TOTAL 147 100.
Walls, partitions, overlap, roofing
Preparatory work, installation of forests set - 8500.
Laying of outdoor walls and partitions from blocks 18m3. 980. 17 640.
Device of reinforced concrete monolithic floors 15m3. 2800. 42,000
Device in the formwork of reinforced concrete belts, jumpers 34.rm. M. 360. 12 240.
Installation of metal structures set - 32 500.
Build wooden structures set - 29,700
Assembling roof elements with crate device 210m2. 690. 144 900.
Isolation of walls, overlap and coatings insulation 470m2. 80. 37 600.
Hydro, vaporizolation device 470m2. 60. 28 200.
Wooden roofing coating device 210m2. 540. 113 400.
Installation of the drain system set - 8300.
Swinging sinks 14m2. 390. 5460.
Filling the openings by window blocks 12m2. - 12 300.
Other works set - 24,700
TOTAL 517 440.
Applied materials on the section
Block Ceramzitobetone 18m3. 2100. 37 800.
Masonry solution 3m3 1490. 4470.
Concrete heavy 18m3. 3100. 55 800.
Rental of steel, steel hydrogen, fittings set - 18 300.
Sawn timber 10m3. 4500. 45,000
Paro-, wind-, hydraulic films 470m2. - 25 850.
Insulation Paroc. 470m2. - 63 450.
Wooden tile, components 210m2. 970. 203 700.
Drainage system (tube, chute, knee, clamps) set - 13 200.
Wooden window blocks with a glass 12m2. - 95,000
Other materials set - 23 900.
TOTAL 586 470.
Engineering systems
Autonomous Water Supply Device (Well) set - 79,000
Installation of wastewater treatment system, set - 57 900.
Soil filtering facilities
Electrical and plumbing work set - 160,000
TOTAL 296 900.
Applied materials on the section
Wastewater treatment system set - 92 000
Two-incident boiler on Viessmann liquid fuel set - 56,000
Plumbing and electrical equipment set - 320,000
TOTAL 468,000
FINISHING WORK
Facing the walls and ceilings set - 210 500.
Plasterboard sheets
Device board coatings 70m2. 420. 29 400.
Ceramic coatings set - 118,000
Tiles, wall cladding
Facade, carpentry, plaster set - 452 800.
and painting work
TOTAL 810 700.
Applied materials on the section
Massive board, ceramic tile, plasterboard, door blocks, staircase, decorative elements, varnishes, paints, dry mixes and other materials set - 1,080,000
TOTAL 1,080,000
* - the calculation is made on the averaged rates of construction firms Moskva without taking into account the coefficients

Combining in one building at once several functions - a favorable reception: it allows you to save the area of ​​the site, and funds spent on construction. One example of such a rational solution is a guest house, which we are going to tell.

This house is located on the territory of the estate located in one of the most beautiful places of Latvia. Despite the modest dimensions, it combines a number of appointments, being a guest house, a garage and ... a mini substation.

Building is located just 15m from the master's house; Together they form a holistic architectural complex and are decorated in a single style, the features of national architecture and techniques of modern construction are connected. Between buildings laid a paved paving tiled track, above which high pergola is made.

Practical combination

The first floor of the building is fully assigned to technical services. There is a garage, designed for several cars, including non-standard dimensions (in the central part of the parking area of ​​a large car). At the lower level, there is also a separate workshop and boiler room with heating equipment servicing directly a guest house (two-circuit boiler Viessmann, Germany). In addition, there is a technical premises with a diesel generator provided for in the case of possible problems with municipal power supply. This portable electricity source will be able to serve electricity into all manor buildings before troubleshooting the central network.

The second floor is a attic that has a living area: a bedroom, a spacious seating area and a bathroom with a shower, everything is necessary in order to ensure guests comfort. For complete autonomy, it is not enough for the kitchen. However, its absence is compensated by the proximity of the construction to the "main" house: it is worth passing a few meters along the picturesque track and will be under the telescope of hospitable hosts.

In rural spirit

In the interiors of the residential premises, the Country Style prevails, which declares itself already in the outer design of the construction. Outdoor coating of a room is a pine board, the surface of which is treated with protective oil composition, which preserves the natural color of the tree. Wooden racks and roof beams based on them are part of the interior. Walls and ceilings, tinted with plasterboard and painted in white, cause associations with a whitewashed barn rustic house. An outfacing furnishings perfectly fits light wicker furniture: chairs, couches, beds. The bathroom is resolved in classic style. Paul and low sections of walls made of moisture-resistant drywall are lined with ceramic tiles of warm light beige color, with a pattern resembling sandstone texture. Apled part of ceramic facing made decorative bulge.

Fundamental Soyuz

For convenience, the garage is made in the form of a platform with a canopy, thanks to which the machines are free to enter and go away. A dual-ends and a longitudinal garage fraperate the technical premises whose walls are composed of ceramzite-concrete blocks, and from the second finish, a small partition from the same blocks. Result Garage is open only on the one hand.

Since the construction is combined, its foundation combines elements of tape and columnar structures. So, under the bearing walls, a reinforced concrete belt foundation was connected by 1.4 m. Assue is a queue, under each of the wooden supports of the inter-stroke, performing and the role of a canopy over the garage, a separate reinforced concrete pillar is supplied, which goes into the ground also 1.4 m.

Brick plus stone

The main material for the walls are clamzit concrete blocks FIBO (Estonia). Along with them, natural stones are included in the masonry, which gives the surface a special color. Outside, the ceramzite-concrete areas are covered with textured plaster, imitating the old plastering with irregularities, small cracks, places of faded paint. Fragments of stone masonry, as it were, appear through the "old", as if impudent plaster. The same reception is used in the outer decoration of the walls of the Big House. Since the narrow windows of all technical premises are placed under the ceiling, there are metal racks on these sites that make up the weight of the top segment of the wall.

The walls of the first floor of the guest house are insulated on the inside of the Mineral Wool Paroc (Finland). Here are exclusively technical premises, so the thickness of the insulation is small - only 50mm. Over plate mineral wool-film vaporizolation. Interior wall decoration - from drywall.

Overlapping-shed

Over all technical premises, monolithic reinforced concrete overlap, but the site of the inter over the garage has a beam design. It was built using metal channels (with a shelf of 52mm), which rest on the outer walls, as well as on the rigleel connecting the wooden rack along the longitudinal side of the building from the entrance to the garage. All openings between the racks are closed with metal garage gates of a roll type, guarding the house from the uninterested visitor.

The intergenerational overlap is insulated accordingly, since the unheated garage room is located under it. The role of the thermal insulation material plays an eco-water (layer thickness - 120mm). Cleaning overlap - from moisture-resistant drywall.

Modern "old" roof

Waller the roof is crowned. It is thoroughly insulated, as the second floor is a residential attic. The thickness of the layer of the insulation mineral wool Paroc- 200mm. From the side of the inner premises, the insulation is protected by film vapor insulation. The roof is waterproofed using a PVC membrane. The spectacular wooden roof continues the "historical" theme specified by the appearance of the estate. She, as well as the roof of a large house, is made of a wooden truncation made in German technology from the Siberian larch wood. Twerful sides of the roofs are designed two lug-free with arched completions. One - in the center of the roof of the roof, above the recreation area, the second, from the opposite side, is somewhat shifted to the left and fall on the area of ​​the staircase. Thus, the level of upper overlap is increased and a comfortable rise in the second floor is ensured. Arched completion of Lugarne is covered with copper sheets. From the same copper sheets and salaries of combined mansard windows are also made. The choice of this material is determined, firstly, its resistance to the effects of atmospheric precipitation, and secondly, aesthetic considerations, as copper is perfectly combined with wooden roof.

Strict calculation

Each of the technical premises of the first floor has a separate entrance from the garage. Wobked in the attic guest zone can be found, rising in a two-day staircase on a small staircase directly in front of the rooms, which is perfectly illuminated thanks to a large attic window.

The entrance door opens to the miniature corridor. The sides of the corridor is the entrance to the bedroom, in the center - in the bathroom, right-in a fairly spacious seating area. Here you can highlight the living room by the window at the window where the wicker chairs are standing - both the bed with a bed and a couple of couches. According to the project, the guest house is designed to accommodate six people.