Redevelopment of typical "doubles" area of 46.4 m2 in a panel house. As a result, a full-fledged hallway-corridor and a bedroom isolated.
![Japanese Khrushchev](/userfiles/56/13443_3.webp)
![Japanese Khrushchev](/userfiles/56/13443_4.webp)
![Japanese Khrushchev](/userfiles/56/13443_5.webp)
![Japanese Khrushchev](/userfiles/56/13443_6.webp)
![Japanese Khrushchev](/userfiles/56/13443_7.webp)
![Japanese Khrushchev](/userfiles/56/13443_8.webp)
![Japanese Khrushchev](/userfiles/56/13443_9.webp)
![Japanese Khrushchev](/userfiles/56/13443_10.webp)
The proposed project of redeveloping typovascular in the panel house proves that there are no hopeless situations. Aside, where one of the bearing walls runs between two living rooms, it was almost no possibility to remake anything in accordance with the current idea of the organization of residential space. Isv and the same decision was found.
Solid shortcomings
Initially, typical layout of a two-room apartment was extremely unsuccessful. Crumbling entrance hall, bathroom and toilet, close kitchen, availability of passage (and diagonally!) Rooms and elongated, as a penalty, the only isolated residential premises delivered inconvenience in everyday life. Most of all did not suit the separate bathroom: a toilet net, in which it is necessary to touch the walls, and the bathroom, where there was not enough space for the washing machine. A correspondence of the normal hallway created problems with the storage of the outerwear, it was not possible to unrest and releasing, as well as to meet and hold guests.Smash space
Much of modern architectural trees The passing room of the room was combined with a kitchen. The inner partition separating these premises was demolished. In her place, there was actually a passage into the kitchen and a new zoning partition, downlooking the kitchen table. It overlooks the living room and you can watch TV. I must say that the kitchen table turned out somewhat unusual. Initial edge of the laminated tabletop is embedded washing. Initially, the sink in the kitchen (and, accordingly, Dzer) was located at the opposite wall, which is now fully occupied by the "Announcement" kitchen set, with built-in home appliances. The lack of work space led to a non-standard solution to move the sink. Technically did this: the tanning tube under the slope was laid In the newly erected partition and brought into the bathroom.
Based on the Japanese house
Wide opening leads to the living room. Twin, as required by the selected style, is the minimum of furniture, so that every item does not care.
Special mention deserves decor walls. One of the walls in the living room is saved with squares sliced from wallpaper with stamped paper, - Collection Osiris II (Arte, Belgium). Another separating the living room from the corridor is decorated with a translucent panel from Natural Onyx. The natural pattern of a stone fascinating with its beauty emphasizes the commitment of the ecological line in the creation of the interior and contributes to the penetration of light into the input zone. Delicate flavoring in the bedroom was created thanks to the successful combination of a bedroom with light wood Tomasella (Italy) with the color of the wallpaper from the ARSE IS AROSE collection (Arte).
Decisive centimeters
Old Parquet Voted Replaced Parquet Board from Wenge Hoens (Germany). Previously, parquet in the apartment was a chalk on the lags that had to be dismantled. The new base was a cement-concrete screed; It wasolated, layer of plywood (substrate), and a parquet board from above. In general, it gave a small winnings in height. The total floor thickness on the lags was 7cm, and the cement-concrete screed "ate" only 3 cm. Supporting that the height of the ceilings in the apartment is 2.5 m, the extra centimeters turned out to be quite by the way. This made it possible to install white stretch ceilings Extenzo (France). With a small height of the premises and the presence of uneven jacks of the stretch ceiling is the optimal solution to the problem.
Restructuring on the scale of the bathroom
In addition, Santekhkabina has its own ceiling with a height of 2.3m, which is 20-30cm less than the height of the ceilings in the rest of the premises. During the construction of the house (the ready-made module of Santekhkabina, with the help of a crane, put the place to her) on her roof every garbage rolls and remains there. Naturally, small particles of construction dust from the roof of Santechkabina are transferred to the premises, worsening the microclimate in the apartment. In the same place, on the roof of Santechkabina, lay the wiring, to which there is no access in this place. All these unpleasant nuances force tenants if possible to get rid of an unsuccessful module. Of course, the liquidation of Santechkabina needs to be coordinated. Partial redevelopment, such as demolishing one of the partitions or ceiling, is not recommended, as the design will lose the rigidity and the remaining parts can over time
Because of all the listed shortcomings, Santechkabin in the apartment was decided to break. New walls of the bathroom laid out of the blocks of foam concrete material with good heat and sound insulation,
Cost of preparatory and installation work | |||
Type of work | Scope of work | Ral payment, $ | Cost, $ |
---|---|---|---|
Dismantling partitions, Santekhkabina | - | - | 290. |
Door opening device (with metal o'clock) | 1 PC. | - | 300. |
Cleaning surfaces from plaster, wallpaper IT.d. | 120m2. | 3. | 360. |
Dismantling outdoor coating | 46,4m2. | 3.5 | 162. |
Device partitions from wall blocks | 15m2. | 10 | 150. |
Loading and removal of construction trash | 3 containers | - | 350. |
TOTAL | 1612. | ||
Cost of materials for installation work | |||
Name | number | Price, $ | Cost, $ |
Wall block (foam concrete), glue mixture | 15m2. | - | 115. |
Rental of steel, electrodes | - | - | 90. |
Garbage bag | 200 pcs. | 0,3. | 60. |
TOTAL | 265. | ||
Cost of work on the device of floors | |||
Type of work | Area, m2 | Ral payment, $ | Cost, $ |
Device of coating waterproofing | 46.4. | five | 232. |
Concrete tie device | 46.4. | eleven | 510. |
Flooring plywood on glue with fastening | twenty | 4.7 | 94. |
Parquet Board Coating Device | twenty | 10 | 200. |
Ceramic Tiles Coating Device | 26,4. | - | 530. |
TOTAL | 1566. | ||
Cost of materials for flooring device | |||
Name | number | Price, $ | Cost, $ |
Waterproofing (Russia) | 50kg | 2.7 | 135. |
Peskobeton (Russia) | 1900kg | 0.07 | 133. |
Plywood FSF | 9 sheets | fourteen | 126. |
Parquet board (Germany) | 20m2. | 48. | 960. |
Ceramic tile | 26,4m2. | - | 980. |
Tile adhesive (Russia) | 132kg | 0,3. | 40. |
TOTAL | 2374. | ||
The cost of finishing work | |||
Type of work | Scope of work | Ral payment, $ | Cost, $ |
Installation of stretch ceiling | 46,4m2. | - | 1300. |
Watching surfaces | 140m2. | 10 | 1400. |
Wall painting and wallpaper | 112m2. | sixteen | 1792. |
Facing walls with ceramic tiles | 28m2 | 22. | 616. |
Carpentry, carpentry work | - | - | 450. |
TOTAL | 5558. | ||
The cost of materials for the production of finishing works | |||
Name | number | Price, $ | Cost, $ |
Stretch ceiling extenzo. | 46,4m2. | 37. | 1717. |
Stucco "Rotband", putty | 1620kg | - | 580. |
Soil DFA, "Betokontakt", glue | 200kg | - | 264. |
Paint V / d, wallpaper Arte | - | - | 750. |
Ceramic tile Porcelanosa. | 28m2 | - | 1400. |
TOTAL | 4711. | ||
The cost of electrical work | |||
Type of work | Scope of work | Ral payment, $ | Cost, $ |
Installation of wiring, wires | 340 pound M. | - | 510. |
Installation of power and low-current | set | - | 310. |
Installation of switches, sockets | 30 pcs. | 10 | 300. |
Installation of floor heating system | set | - | 140. |
TOTAL | 1260. | ||
The cost of electrical materials | |||
Name | number | Price, $ | Cost, $ |
Electro-, telephone, antenna cables and components | 340 pound M. | - | 350. |
Electric, protective shutdown devices, automata (Germany) | set | - | 260. |
Electric installation (sockets, switches) | 30 pcs. | - | 350. |
Floor heating system (cable, coupling, thermostat, sensor) | set | - | 430. |
TOTAL | 1390. | ||
Cost of sanitary work | |||
Type of work | Scope of work | Ral payment, $ | Cost, $ |
Laying water supply pipelines | 29 pog M. | 7. | 203. |
Laying of sewage pipelines | 8 pose. M. | 3. | 24. |
Collector installation, filter | set | 60. | 60. |
Installation of toilet | 1 PC. | fifty | fifty |
Installation of washbasin, bath | 2 pcs. | - | 210. |
Installation of heated towel rail, water heater | 2 pcs. | - | 70. |
TOTAL | 617. | ||
Cost of plumbing materials and installation devices | |||
Name | number | Price, $ | Cost, $ |
Metal Pipes (Germany) | 20 pound M. | 2. | 40. |
Sewer PVC pipes, angles, taps | 9 pose M. | five | 45. |
Distributors, Filters, Fittings | set | - | 180. |
Toilet bowl, washbasin, bath, faucets, heated towel rail | set | - | 1200. |
TOTAL | 1465. |