![Pure philosophy](/userfiles/56/13501_9.webp)
![Pure philosophy](/userfiles/56/13501_10.webp)
This small building from the haronous, traditional foraies somehow do not want to call a bath. Included in a single manor ensemble alongside the main and guest houses, it embodies in itself the whole philosophy of country life, a relaxing rest, relaxation surrounded by nature
Perhaps the first thing that attracts a look toward this building is the amazing consonance of the surrounding landscape. Low, with brick walls growing straight from the ground, she almost entirely hidden under the wide rods of a hip roof. It may be precisely because of the large tiled roof of a calm green color. The bathhouse is perceived as the lower tier spreading right behind him a pine grove. Ito still on the approach to the sauna configures on the upcoming procedure for cleansing the body and soul.
From the main house to the bathhouse, 20-30 steps on the crucible diagonal of the garden path. The glazed facade of the structure facing an extensive lawn is perfect for the idea of fusion of the indoor and external space. On the same time, double-colored swing doors, of which, in fact, the described facade, in the inside, reliably protect the bathhouse from wind, cold and dampness.
Another binder between the construction and landscape of the open terraces under the visors of the roofs of the roofs of the roofs. They form a house around the perimeter, forming an input zone in front of the main facade, a cozy corner of relaxation on the right side of the house, and with the rear, where the rods are lowered quite low, the economic zone. The floor and ceiling of the input zone are trimmed with a tinted pine board. Flat "tablets" of lamps are embedded. On special hooks to it is suspended baskets with beautiful-waving ampellable plants. The key of the same vehicle was solved by the right terrace, the wooden flooring of which is issued from the visor into the garden space. The economic zone is paving paving slabs. On the left to the house, the small pool of a skimmer type is adjacent, embedded into a gentle natural slope. The walls are cast from reinforced concrete and outside decorated with artificial stone under the sandstone. The inner surface of the pool bowl is wedged by PVC film blue.
One of the features built is the abundance of entrance doors. In addition to the main facade, which seems to be ready to spread to guests entirely, it is possible to get inside through the glazed door of the open corner terrace. Wide glazed doors associate a house with a swimming pool. All of them lead to the main space of a bathhouse, filling it with natural light. Now, the room is reliably protected from direct sunlight with low roof slots. Additional protection from the sun-blinds "Bambo" from IKEA, Sweden (18 $ / m2).
The walls of the spacious recreation area are separated by Eurovantia with a log laying effect, on a semi-ceramic tile with a relief pattern. The low ceiling is peeling with moisture-resistant plasterboard. Massive wooden beams divide it into squares, in the center of which point dot halogen lamps are built. Additional lighting provide lamps, set on both sides of a wicker sofa. Near the same armchairs and a coffee table deployed to the open furnace of the fireplace. Sofa group, a pair of round leather puffs and a suspension chair, and the entire setting of this room. The main decoration of the interior is undoubtedly a wall fireplace, an unusual form and design of which are forced to think about his ethnic roots.
1. Recreation 1. Recreation 2. Economy-technical premises 3. Parisy 4.Sanzel 5.The TV 6.Decene Cabin 7. Bassaine SPA 8.Things 9. Economy Zone
Technical data
Total bath area ................. 72,5m2
Designs
Foundation: Reinforced concrete plate
Outdoor Walls: Brick
Interior walls and partitions: Brick
Overlap: Wooden beams
Roof: Slinged design, vaporizolation, flexible tiling icopal (Finland), mineral wool insulation
Windows: Wooden with double-glazed windows
Life Systems Systems
Sewerage: Municipal Network
Water supply: municipal network
Power Supply: Municipal Network
Heating: Gas boiler
Gas supply: municipal network
Interior decoration
Gender: refractory brick, ceramic tile La Fabbrica (Italy)
Walls: Eurovand (Pine) with a log laying effect; Eurovantia (alder)
Ceiling: Waterproof Plasterboard, Euro Mark (Alder)
Furniture: Wicker from Rattan Wood (Italy)
Equipment: Kamenka Kastor, Spa Pool
The fireplace divides the space into two zones. Opel, intended for a relaxing holiday, we have already spoken. The second is given under the bath procedures. Its main and the only "acting person" is the spa pool. Near the exit to the open corner terrace there are a bathroom and shower. The door from thermo-protective tinted glass leads to the Holy Saints Banner House. Everything else is only a prelude or a soft completion of the acute pleasure delivered by dry steam.
The sauna room is small - only 22m. Nevertheless, two people can batim in it, conveniently setting around on fairly wide shelves. They are made from Abashi African tree, which, thanks to its porosity, almost does not heat up. Notice: the gaps are left between the shelves boards so that their surface does not interfere with free air circulation. The floor in the steam room is lined with ceramic tiles and covered with a removable wooden flooring. Such a solution is most rational from the point of view of fire safety and hygiene. The brick walls of the sauna, as well as the ceiling are covered with eurryali from alder with efficient heat and vaporizolation. The naked brickwork is left only where a wood-stove stove is adjacent to the wall. To avoid random burns about the metal case of the furnace, it was welded with a wooden fence, located from highly heated surfaces by about 15 cm. Kamenka furnace is outside the sauna near the rear wall of the fireplace, where a comfortable niche is arranged with shelves for storing firewood and bath accessories. The fireplace and bake of the bath have a combined chimney, otherwise they are completely autonomous. Ventilation system in the sauna is natural, subtle-exhaust. The outlet of the ventilation canal, common to all rooms of the bathhouse, is located in the body of the smoke tube. The chimney metal casing, which runs on the top of the external wall of the sauna from the heater to the fireplace, is trimmed with a pine clapboard.
The all-glass sauna door, as it should be, opens out. Through a tinted glass, even through the curtain, the pair is well visible filled with cool water spa, ready at any time to massate the body of a dry pair of a dry pair of an extreme temperature. However, you can choose another completion of the bath procedure: either to go to the terrace so that, sitting in a comfortable chair, to substitute yourself a lightweight breeze, or dive into an outdoor pool, where the relaxed muscles will again gain strength and elasticity, or just pass the evening in the fireplace for unhurried conversation with friends.
Enlarged calculation of the cost of work and materials for the construction of the bath with a total area of 72,5m2
Name of works | Units. change | Number of | Price, | Cost |
---|---|---|---|---|
Foundation work | ||||
Preliminary layout, development and recess | m3. | 38. | 12 | 456. |
Foundation base device | m2. | 74. | 3. | 222. |
Waterproofing Horizontal Hydrosteclozol (2 layers) | m2. | 74. | five | 370. |
Protective screed for waterproofing | m2. | 74. | four | 296. |
Device of foundation plates of reinforced concrete | m3. | 22. | 60. | 1320. |
Device of lateral coating waterproofing | m2. | 17. | four | 68. |
Transportation of soil by car dump trucks | m3. | 38. | 7. | 266. |
TOTAL: | 3000. | |||
Applied materials on the section | ||||
Concrete heavy | m3. | 22. | 64. | 1408. |
Crushed stone granite, sand | m3. | twenty | 28. | 560. |
Hydrosteclozol, Bituminous Mastic | m2. | 17. | 3. | 51. |
Rental of steel, fittings, knitting wire | T. | 1.5 | 620. | 930. |
TOTAL: | 2950. | |||
Walls, partitions, overlap, roofing | ||||
Laying of outdoor walls with facing facial brick | m3. | 32. | 55. | 1760. |
Devices of reinforced brick partitions | m2. | twenty | 10 | 200. |
Build elements of the roof with the device of the crate and coating plywood sheets | m2. | 73. | sixteen | 1168. |
Device of vaporizolation | m2. | 250. | one | 250. |
Isolation of walls, coatings and overlaps insulation | m2. | 250. | 2. | 500. |
Bitumen Tiles Coating Device | m2. | 150. | eight | 1200. |
Cases of walls with decorative board, clapboard | m2. | 80. | 12 | 960. |
TOTAL: | 6040. | |||
Applied materials on the section | ||||
Ceramic construction brick | thousand pieces. | nine | 170. | 1530. |
Brick ceramic facing | thousand pieces. | four | 200. | 800. |
Masonry solution | m3. | 7.8. | 56. | 437. |
Armature, grid | T. | 0,3. | 610. | 183. |
Paro-, wind-, hydraulic films | m2. | 250. | 2. | 500. |
Insulation | m2. | 250. | four | 1000. |
Sawn timber | m3. | 6. | 120. | 720. |
Plywood FSF | m2. | 150. | five | 750. |
Bituminous tile, Dobornye elements (Finland) | m2. | 150. | - | 1650. |
Blockchaus (Finland) | m2. | 60. | 17. | 1020. |
Lining (Alder) | m2. | twenty | eighteen | 360. |
Stove-Kamenka (Finland) | PC. | one | 392. | 392. |
TOTAL: | 9340. | |||
Total cost of work: | 9040. | |||
Total cost of materials: | 12 290. | |||
TOTAL: | 21 330. |