Bathroom (bathroom and toilet) with an area of 3.9 m2 in a one-room apartment of the Cope series. Implemented project. Estimation.
The residential panel houses of the CE series consist of ordinary and rotary layout elements (CAPs) and include one-, two-, three- and four-room apartments. The outer walls are 300-millimeter three-layer panels, the inner walls are reinforced concrete, thickness of 140, 180 and 220 mm. Partitions and reinforced concrete overlap 140-millimeters. Ventilation Natural exhaust, carried out through ventilation channels in the kitchen and in the bathroom, cold and hot water supply centralizedBathroom is stainless steel, glass and energetic contrasting colors
The Jacob Delafon ($ 320) bath is enclosed in a translucent cylinder of polycarbonate and matte glass, fenced, in turn, metal railings. The right-glass door in the metal binding, the true child of the style of High TechHouses of the apartment, a modern business man, wanted his dwelling to be made in the style of High Tech. With all the consequences arising from here: freely reported spaces, abundance of glass and metal. Looking at the project implemented, it is possible to say exactly: the new bathroom is the most original and, perhaps, having the most direct attitude to the style of High Tech room. Combination of translucent walls with trimmed metal and lined matte tiles (gray, yellow and black), a ceiling of polished chrome plated rivers, a stainless steel plumbing kit is not called styling, everything is "honest" here. Analyzed work with the fact that partitions were demolished, separating the bathroom, toilet and kitchen, and destroyed all the signs of the old finish - fine ceramic tiles. The floors were leveled by a mixture "Old", after which they laid the tie. The occurrence of the podium has a purely practical cause: the equipment of electric heating floor is hidden in its depths. Avteda as logical and beautifully happened! Already after the device, the podium was erected a wall, which is an impressive size of a translucent cylinder of polycarbonate and matte glass, fenced with shiny metal railings. Only by opening the glass door, you will find out that ins- completely unusual, under the framework, bathroom.
The wall of the matte glass becomes an additional source of light in the bathroom. If you look according to plan, it is almost opposite the large kitchen windowTypes of jobs | Scope of work | Ral payment, $ | Cost, $ | Name of materials | number | Price, $ | Cost, $ | TOTAL, $ |
---|---|---|---|---|---|---|---|---|
Device Podium | 1,45m2 | twenty | 29. | Dry mixture "Birsss16", "Experienced plant dry mixtures"; clay | 360kg | 0.04. | 14,4. | 43,4. |
Cement screed device with waterproofing | 4.2m2 | 6.5 | 27.3. | Dry mixture of "Birsss", "Experienced plant dry mixtures" | 224kg | 0.04. | 8,96 | 43,41. |
Hydrokhotloizol ("Philicraft", Russia) | 5,5m2 | 1,3. | 7,15 | |||||
Walling | 5m2. | 10 | fifty | Polycarbonate | 5m2. | 9,83. | 49,15 | 99,15 |
Alignment of walls | 23m2. | eight | 184. | Stucco "Rotband" | 161kg | 0.04. | 6,44. | 190.44 |
Installation of the floor electrical heating system | 3,6m2 | 10 | 36. | Devi Floor Heating System (Denmark) | Set | - | 171. | 207. |
Wall and Paul | 29m2. | 13 | 377. | Ceramic tile Gemmi (Italy) | 29m2. | nineteen | 551. | 928. |
Strosion of walls under the pipe and wiring | 14 pog. M. | nine | 126. | - | - | - | - | 126. |
Laying pipes of water supply and heating | 9 pose M. | five | 45. | Metal-polymer pipes | 9 pose M. | 6. | 54. | 99. |
Laying electrical cable | 6 pog. M. | four | 24. | Cable set | 6 pog. M. | one | 6. | thirty |
Installation of the door block | 1 PC. | 40. | 40. | Glass door (Italy) | 1 PC. | 436. | 436. | 476. |
Installation of the suspended rush ceiling | 4.2m2 | 10 | 42. | Rack ceiling (polished chrome) "Specstroy" (Russia) | 4.2m2 | fifteen | 63. | 105. |
Installing washbasin and toilet | 2 pcs. | 42. | 84. | Sink, toilet KUHFUSS SANITAR (Germany) | 2 pcs. | - | 1035. | 1119. |
Bath installation | 1 PC. | 80. | 80. | Bath Jacob Delafon (France) | 1 PC. | 320. | 320. | 400. |
Installation of towel rail | 1 PC. | fifty | fifty | Electric towel drying | 1 PC. | 155. | 155. | 205. |
Installing outlets and switches | 3 pcs. | 3. | nine | ABB electrical installation equipment | - | - | 36. | 45. |
Installation of built-in luminaires | 4 things. | five | twenty | Osram lamps (Germany) | 4 things. | 10 | 40. | 60. |
TOTAL: | 1223.3. | 2953,1 | ||||||
TOTAL: | 4176,4 |