New life

Anonim

Typical "treshka" for a classic family of three. Apartment repair with a total area of ​​73.3 m2 in the P3-16 panel house. Estimates.

New life 14298_1

New life of secondary housing
The main wall of the living room was decorated with five niches, the framework of which is made of the same metal guides as the frame of the wall cabinets, and also trimmed with plasterboard ("Knauf-leaf"). The construction of this wall was worth $ 153, and its facing with artificial stone - about $ 215 (materials and work)
New life of secondary housing
For frame for built-in wall cabinets, a metal profile from "Knauf Gypsum" was used. But preliminarily built the support column (trap)
New life of secondary housing
And so that the ceiling seemed higher, created the similarity of the backlit dome. This design costs about $ 220 (all materials and work)
New life of secondary housing
Creating such a podium area of ​​6.37m2 cost the owners of about $ 300 (work and all materials, including the Spanish Facing Tile Peronda)
New life of secondary housing
The new opening between the kitchen and the living room hides under the paint and stucco strengthening its massive metal frame. Creating this opening - starting redevelopment point
New life of secondary housing
In the nursery, too, there is a dressing room. VEU small room child can enter to put or take with numerous shelves, racks and hangers
New life of secondary housing
Parquet board (Junckers) is scored from planks of a piece parquet (deira tree). Dwton came laminated finish (subtree) window frame and windowsill
New life of secondary housing
In the bathroom for installing the shower, also raised the podium, in which there are pipes for the supply and removal of water. Ceiling here suspended, from plastic panels
New life of secondary housing
The new spacious bathroom has a shower cabin, and a corner bath, and a toilet, and a washbasin with two tanks.
New life of secondary housing
In a disassembled bathroom, removing the former laying of pipes, made the insert in the risers and mounted a new wiring. Installed filters, water pressure gauges, as well as water consumption sensors
New life of secondary housing
This design was built in the bedroom. Later it was closed with plasterboard, painted and with the help of specialists Komandor turned into a small dressing room
New life of secondary housing
The walls of the bedroom form a semiman. Such a room turned out to be a built-in wardrobe. One sash of her doors was finished with a veneer of cherry, the other is a mirror

New life of secondary housing

New life of secondary housing
Plan before reconstruction
New life of secondary housing
Plan after reconstruction

This apartment is not new. I clearer buying the current owners, she already had a considerable experience of serving people - more than 25 years. That is, it was a typical representative of the so-called "secondary housing", and even very launched. Opening the floors, cleaning walls and ceilings told the entire two cosmetic repairs made long ago and a long time ago. Typical layout - also "Nestedevar". Therefore, it was decided to remake everything, in other words, to produce reconstruction.

The reconstruction of a three-bedroom apartment in the P3-16 panel house turned out to be the case at all, both at the design stage and at the stage of the embodiment of the conceived, since the object had a lot of serious flaws. All internal wall-carriers, from reinforced concrete, which radically limited repaid capabilities. The apartment had a small separate bathroom and there were no utility rooms at all. The ceiling in the corridor was extremely reduced due to the traditional in recent times of Antlesole. Since the apartment corner and its outer walls are thicker than in other similar "treshki", the rooms were also less.

On the state of the bathrooms showed the fact that the last time they were repaired for more than fifteen years ago. Walls and ceiling were plated with wallpapers on top of the water-emulsion, at one time we changed the lime blotch. Only the state of the balcony and the loggia turned out to be satisfactory. On the latter there was even glazing, but not a professional, and homemade, collected from wooden and aluminum frames.

Plans

The apartment acquired a "classic" family of three people, mother, mother, child school age. The head of the family, contacting the company "Gale" (which found through our magazine), shared his plans regarding the future appearance of the dwelling. Together with the designers, discussing various sketches, managed to determine the main tasks of the subsequent reconstruction:
  • An increase in the bathroom by attaching part of the corridor area to it. The result is a large bathroom with a shower and a complete set of Santechnibors.
  • Change the location of the doorway of the kitchen (the input device in it from the living room).
  • New glazing, as well as warming and decoration of the loggia, its equipment by sliding glass doors. Thanks to this, the bedroom is more comfortable, which is adjacent to this loggia.

For the search for the main architectural and planning solution, work on the sketches and their approval took only 10 days, and 1 eminence worked on the creation of a complete package of project and engineering documentation. In general, the project of reconstruction of a three-room apartment (73m2) cost $ 1825. Rate of design work ($ 25 for 1m2) is lower than in Moscow.

All redevelopment is agreed in the MVK. The coordination lasted 3 months (it began simultaneously with construction work). For approval of changes and obtaining all permits it took $ 2400. Chernoby construction and preparatory work were completed for 3 months. Finishing work - for 2 months. All equipment was mounted for 1 month.

Walls

Since this apartment is located on the third floor of a twelve-story panel house, the opening in the bearing wall could be cut out no closer than 1300mm from the outer wall. In this case, the width of the opening could not exceed 1200 mm.

For cutting, the opening was used already tested technology. So, at first all the electrical pipes were de-energized. Then, on both sides of the intended opening, on cement gravy, temporary metal racks made of pipes (diameter100mm) were installed made of steel 5mm thick. They supported slabs overlapping over future opening.

According to the outlined circuit, the opening was drilled through holes with a diameter of 25mm in a step of 60 mm, and then combined them into the through slot. In order not to damage the floor overlap plates with a drop of heavy concrete wreckages, cut sliced ​​slices to "slices" (no more than 4040cm) and did not allow them to fall from height. (Works on the reinforced concrete design layer cost about $ 120, at the rate of $ 53 per 1m2) after the opening was created, installed the upper horizontal beam (from a width of 18 cm wide, that is, an equal wall thickness), pre-laying a cement mortar layer ( M100), and tightly pressed it to the upper face of the opening. After that, it was adjusted and mounted the racks (from the same channel). They were installed on cement gravy, and at the top welded to a horizontal beam and withstood three days. Only then dismantled temporary racks. (Designers exercised over the entire process.) The cost of such a design together with the installation- $ 178. Total new opening cost $ 298. In the same way, there were expanded and reinforced by the beams from the opening of the openings in the corridor and the hallway.

When creating an opening in the carrying walls of high-rise buildings, to ensure the integrity of the concrete structure, it is forbidden to use a tool with high impact energy (inters of a jackhammer and concrete, which do not lead to the formation of numerous cracks). According to the rules, it is necessary to use concrete cutting technology along the contour of the disk power tools or the vibriate perforator, also recommended by SNiP. The second case used the second option. (Aisputing diamond spraying discs, made a stripper for laying on the walls of pipes and cables.)

As a result of alignment of the walls, the entire metal portal turned out to be completely hidden under the layers of the plaster "Rotband" ("Knauf Gypsum", Russia). After putty and primer, all the walls and ceilings were covered with paint Scotte3 of Beckers (Sweden). Designers previously worked with this material, therefore offered it for this object. Before applying paint, according to the instructions, it is necessary to process the surface with a special primer of the same company (for better clutch, in order to avoid detachment). This is a water-based latex primer paint Scotte GRUND (10l- $ 48). Giving a soil 3 hours for complete drying, ceilings and walls smoothly rolled the paint Scotte3, creating a smooth matte surface. After all, cleanliness, quality and accuracy of the finishing works have long been appreciated because they are aesthetic factor.

Floors

From the floors they took off the old two-layer flooring and an old tie. Then they took up the creation of podium - one in the kitchen, the other in the bedroom, on the border with the loggia. It was done so. First, on the purified slab overlap, the curved boundaries of future structures were laid on bricks. Then the resulting "reservoir" was covered with clay and on top flooded with cement-sandy mixture. After her ripening, bricks were removed and started creating an outdoor cement-sand tie across the apartment, changing its level in different rooms, depending on how the floor was separated (tiles or parquet).

In the screed partially laid wiring. PUNP3 wires (11.5) and PUNP3 (12.5), telephone wire and cablev, which has been crushed into corrugated tubes with a diameter of 16 and 20mm, were flooded with a prepared cement-sandy mixture based on "Birsss16" ("Experienced plant dry mixtures", Russia ). Avian in the screed was made by the heating mat with a cable of the Spanish company Ceilhit. Here the floor is selected by the Spanish ceramic tiled Marrakech from Marca Corona large size-3333cm ($ 19 for 1m2). Several unusual selection of floor finish in the living room. This is a large ceramic tile, imitating color, and mainly rough, served the texture of coarse, unstored wooden boards. In the kitchen and in the bathroom on the floor and also ceramic tiles. Avot in the bedroom and children was laid by the massive parquet board of the company Junckers (Sweden) on the original brand technology of fast mounting Quick Clip Sistem.

On the prepared (aligned and dried) screed, the deviation of the level of which did not exceed 2mm per 1.5Pog, first the special plastic POLIFILT film (also produced by Junckers), sound and heat insulating, protecting the moisture on the penetration of moisture below. Two-layered film, 1.5mm-black polyethylene thick, slim layer of felt below the black polyethylene. Then they laid the parquet board without gluing to the base, but only fastening the boards in the "groove-crest compounds" by the special binding material of the company Junckers-glue Sylvafix on a water basis (which it took very little). The bottom of the board is connected by brackets ("clips") - elastic metal plates with curved ends. "Clips" and the film increased the thickness of the coating for another 2mm. Between the walls and edges of the parquet boards left the necessary gaps (25mm more), which were filled with special elastic gaskets. Plinths are also from Junckers.

Wooden Junckers panels (width - 129mm) are scored and glued from planks of a piece parquet. These glued parquet panels with a thickness of 22mm have punch connections from all four sides. In return, the material is covered by two-component polyurethane varnishes manufactured by Junckers. First, the wood was covered with matte varnish MAT, then half a semigloss, and in the final glossy gllankgloss. A total of 5-7 layers of the total thickness of 45MK were applied.

Together with component details, materials and styling work (i.e. turnkey), the floor finish in the bedroom cost $ 75 for 1m2 (Kemampa Tree), and in the children's- $ 65 for 1m2 (deira tree). Floor finishing did not entail changes in the height of the ceilings in the apartment.

Ceilings

The ceiling plates of overlappings after they were cleared of wallpaper and old plaster, turned out to be sufficiently smooth, but lying crookedly levels amounted to 3 cm. The ceilings not only leveled the Rotband plaster, but also, according to the project, decorated with architectural designs of drywall on a metal frame. They were located above the podiums in the bedroom and in the kitchen. The outlines of the visors, as is now accepted, just repeat the boundaries of the podiums. This is one of the premises zoning techniques. On the kitchen podium there is a working area, all kitchen equipment is installed here. AV Bedroom Podium and a visor above it indicate the exit zone through large glass doors on hermetically glazed and insulated loggia.

In wet premises, naughty, on the balcony and on the loggies, suspended ceilings collected from white plastic decorative panels were applied. Essentially mounted with a liner plasterboard ceiling. The wires of these structures are laid by the wires for the power supply of the upper light lamps and corrugated air duct pipes coming from fans (in the kitchen and in the bathroom), as well as pipes for the refrigerant circulation in the split system. Wiring is hidden both in the ceilings of the loggia and balcony.

Electrician

The apartment uses sockets and switches from Prodax (Hungary), Classic series. The wiring inside the walls is carried out by the PUNP cable. For different consumers (lighting, socket group, electric stove, hood, waste chopper in washing, washing and dishwasher) Installed protection machines for 10, 16 and 25a ABB (Germany). For lighting used built-in sources, the power of which does not exceed 60W. At the insistence, the owner refused halogen lamps (so as not to install transformers and simplify the operation of the lamps), preferring them to traditional incandescent lamps of domestic production.

Windows and doors

According to the designer's designer, the customer has chosen the interior doors of the Spanish Factory PORTADEZA (LISA model), veneered with a red tree ($ 160 per piece), and the steel entrance door of the Italian Torterolo factory (Silver model).

The apartment has windows produced by the domestic company "Key Plastkender" from the German reinforced plastic profile of Schuco and its technology. From the side of the frame street, left white plastic, and the other side that was addressed inside the apartment, they were separated, at the request of the owner, laminated coating, imitating the tree (the color of the finishes is called "Golden Oak"). New windows are equipped with a single-chamber double-glazed window (2-fold). They were equipped with microcated steel coated with white plastisol coated (it is aesthetically softens and makes a deaf drop of drops). Accessories (handles with an internal opening and fixation mechanism; loops) - from the German company WINKHAUS. Window, window sills, glazing for a balcony and loggia, fed and visors were made of 12 working days, and delivered and installed for 2 days. For all the new glazing of the apartment, including a balcony and a loggia, was paid $ 5559 (this includes the basic cost of windows, the price of finishing, set of mounting materials, windowsills, tumps and visors, as well as shipping and installation costs).

But alignment of slopes, their putty, primer and painting, the work of the masters of the company "Gale". For it began when the windows were already installed. Incidentally align the slopes of each window of the Rotband plaster cost $ 50 (there is $ 45, in the living room, $ 44, in the children's- $ 41, in the bedroom- $ 57).

Bathroom

The area of ​​the bathroom is increased from 3.9 to 7.3 m2. The new bathroom combined the area of ​​the former bathroom (3.9M2), toilet (1m2), the corridor (2,4 m2) and a small piece of the hallway, to this corridor of the adjoining. The corridor with a new layout turned out to be completely unnecessary. After all, if earlier he served as a link between the hallway and the kitchen, then after the device entry into the kitchen from the living room would turn into a useless impasse. Therefore, it was quite logical attached to the bathroom. Note that such an architectural solution was typical in the reconstructed houses of this series and similar planning. It can be used by apartment owners, in which the passage to the kitchen is bordered by a bathroom. The increase in the "wet zone" at the expense of the part of the corridor is very difficult to agree in the MVK, since it is not prohibited. It is more difficult to coordinate the creation of an opening in the bearing wall between the living room and the kitchen. But with the exact observance of the standards, there is no reason for refusing to obtain permits.

In the new spacious bathroom installed a complete set of plumbing equipment: a shower cabin (9090cm) from the SHOWERAMA line from IDO (Finland), the Ideal Standard suspension toilease, the ESPRIT model ($ 243), reinforced with the Grohe Installation System (Germany), which has been reeling the box from Moisture-resistant drywall. The box was liqueur with the same large-format (2333cm) ceramic tiles as all the walls of the bathroom (Spanish tile of the company Marca Corona, model Caracas, priced at $ 19 / m2). The triangular plastic bath is manufactured by Doctor Jet (Russia), model Sinergia ($ 1230). Next to the risers of water supply mounted a cumulative water heater per 100 liters (Ariston, Italy) for $ 520.

Kitchen and living room

The renovated apartment has kitchen furniture "Pharaoh" Factory "8mart". All technical equipment of the kitchen - from Bosch (Germany): extractor, cooking panel, dishwasher and refrigerator. Inside water supply pipes and power cables to kitchen equipment. Vgipsocardon visor is hidden not only the wiring for upper illumination, but also a corrugated tube-duct (with a diameter of 100mm), which comes from the exhaust to the ventilation mine. The main decoration of the living room is decorative wall with niches and illumination, decorated with artificial stone. The basis of this architectural design - a metal profile frame, closed in two layers of plasterboard sheets. The resulting smooth surface, which was pre-slightly stolen and primed, stuck the tiles of artificial stone (CRACK, model "Rocky Mountain") - light and flat on one side (price- $ 28 / m2).

In the near corner of the living room, there was another niche indoor site of a new diagonal saint laid out in Polkirpich. The cost of 1m2 of such a masonry together with work and materials (brick + solution) - $ 57. True, the wall has to still align the plaster, unlike the walls of smooth drywall or gypsum blocks, and this is an additional $ 8.5 / m2 (plaster + work).

An old window and a balcony door with it replaced the new model and finishes as in the entire apartment. This kit along with the installation cost $ 729. The window (175150cm) with the windowsill and the tump, and the door (21969cm) is a solid glass with one crossbar (impost) in the middle. The glazing of the balcony was worth $ 739, and its insulation and finishing- $ 776.

Children's, Bedroom, Loggia

From the opening of the loggia, the non-carrier part of the plate was removed. This increased the size of the opening, its width was 150 cm, height, 210 cm. We mounted a solid glazing, the so-called "French door" with two sash. Lady-deaf, and the right-sided. This design is the most comfortable, beautiful and expensive part of the glazing of the apartment. Folded and roads the movement mechanism and tight pressing of the sash. The total price of the door (along with delivery, installation, set of mounting materials) - $ 1631. The internal decoration of the Rama is the same "Golden Oak" - increased the basic cost of glazing the apartment by 30% and the production time on 5 days. If the owners left the frames simply white, plastic, this spent could be avoided. But only the glazing frames of the loggia and balcony are made white. In contrast with a wooden floor in the bedroom, this ceramic step is perceived as a small designer find.

The loggia was insulated: built around the perimeter the wall in the Polkirpich (total3,83m2), washed from the inside layer of the mineral wool Rockwool and the vapor insulation film and covered the moisture-resistant drywall sheets. Metallic guides are mounted on their pre-twisted dowels. On top of this were stuck ceramic tiles (Peronda, Spain, Borriol model). Similarly, a balcony was insulated and trimmed. Those parts of the loggia walls that remained free from ceramic tiles were decorated with decorative embossed plaster ("Iris-Decor", Russia-Spain). The glazing of a large curved loggia was worth $ 1267 (4,2m widths and 1.7 m height with two racks, three opening sash, visors and lowers), and its insulation and finishing- $ 1119. Thus, in general, it turned out $ 2386.

RESULTS

The total cost of construction, finishing and installation work (about $ 200 for 1m2) did not exceed the scheduled in the estimate. Included, together with work and materials, repair cost $ 631 for 1m2 (unsigned kitchen equipment). You could save on the purchase of less expensive finishing materials, but, as often happens when the long-awaited new dwelling is arranged, the owner with the hostess could not resist the choice that did.

In fact, the living area decreased, due to the fact that it was given to the construction of wall cabinets and wardrobe. All these four built-in storage systems (two in the corridor, one in the nursery and one in the bedroom) were ordered in Komandor. Their total cost together with measurements, manufacture, installation and sets of internal equipment- $ 3000. But neither ordinary wooden cabinets, nor dresser, no bedside tables, nor boxes, no shelves have to buy at all. At the design stage, the designers saved the space, successfully finding a place for the built-in wardrobes and the dressing room and clearly drawing their shape on the plan. The storage systems turned out to be very compact, because they were either "driven into the corners", or pressed as much as possible to the walls. An Ablagodar of the diagonal location of the facades, set along the routes of movement, cabinets and wardrobe not only do not interfere, but also create comfort and special architectural plastic of the apartment. Azerkivny flaps of sliding doors, as you know, get rid of the feeling of cramped, visually expanding the space. All furniture for this apartment is made in the "8mart" factory.

Estimates

Distribution of repair costs

Repair costs were distributed as follows ($ 631 for 1m2: materials + work, not counting kitchen equipment):

Object costs Cost value, $ Object costs Cost value, $
Project 1825. Living room 8517.
Coordination 2400. Bedroom 7330.
Dismantling 1364. Children's 5161.
Parishion 1982. Kitchen 3891.
Corridor 1420. Balcony 1449.
Bathroom 8347. Loggia 2386.
TOTAL 46072.

Preparatory work in the whole apartment

Type of work 0 Supplies Ral payment, $ Cost, $
Removing wallpaper 125.02m2 0.27. 33.76
Layer of reinforced concrete structures (thickness20cm) 4.53m2. 53,29 241,41
Removal of old paint, plays from the ceilings 57,42m2. 1.33 76,37.
Dismantling door blocks 7,36m2. 4,53. 33.34
Disassembly of light designs 5m2. 1.27 6.35
Dismantling of Santechkabina (Socializing) 1 PC. 250. 250.
Dismantling bath 1 PC. 24.99 24.99
Dismantling shells 2 pcs. 8,37. 16.74
Dismantling of the heated towel rail 1 PC. 12.69. 12.69.
Dismantling toiletza 1 PC. 12.69. 12.69.
Disassembly electric stove 1 PC. 6,61. 6,61
Dismantling of ceramic tiles in the kitchen 2m2 3,47. 6,94
Dismantling tiles from walls (bathroom) 1,2m2 17,1 20,52.
Dismantling of plinth 52.1m2 0.45 23,45.
Linoleum removal 58,28m2 1,21 70.52.
Dismantling of heating pipes 20.5 M. 2.01. 33.17
Disassembly of heating radiators 4 things. 6,65 26.60
Removal of old putty from the walls 125.02m2 1.33 166.28.
Dismantling of the balcony, loggia 2 pcs. 48. 96.
Cleaning joints and seams between panels of walls and ceilings 140Pog.m. 1,1 154.
Sealing junctions between panels 10 pose. M. 1,95 19.5
Layout of a brick wall 0,6m2 34.60 20,76.
Dismantling plate from the opening of the loggia Complex of work 5,59. 5,59.
Dismantling of metal door 1 PC. 5,84. 5,84.
TOTAL 1364,12

Distribution of lamps

Room Number of lamps Power, W
Bathroom 7pcs (moisture-proof) 40.
Parishion 6 ordinary and 1 swivel 60.
Kitchen 8 pcs. 60.
Balcony and loggia 5 pieces. 60.
Bedroom 5 pieces. (swivel) 60.
Decorative 8 pcs. 40.
Design in the living room 2 pcs. 60.
Niche in the living room 1 PC. 40.

Glazing cost

Room Description of the kit Sizes, see Cost (seasonal discount - 20%)
Kitchen A bivalve plastic window from Schuco's profile (Germany) with one swivel and one swivel-folding sash, a mechanism and fittings of Winkhaus (Germany), a laminate finish on one side (color "Golden Oak"), with a single-chamber double-glazed window, Werzalit windowsill ( Germany) and tint (galvanized steel with polyester coated) Window- 175150, windowsill - 15025, OTVD- 15015 618.
Living room Bivalve window to a balcony with one deaf and one rotary flap, with a windowsill and a tump; Glass balcony door with one crossbar (impost). Characteristics are the same Window- 120150, windowsill - 15025, dumper - 15015, door- 6902190 729.
Children's A double-handed window with one rotary and one swivel-folding sash, windowsill and a tide. Characteristics are the same Window - 15050, windowsill - 15025, OTVD- 15015 545.
Bedroom Glass door on a loggia with one deaf and one sliding sash. Characteristics are the same Door 210150. 1621.
Loggia Glazing by plastic windows from the profile of Schuco, with single-chamber glass windows, a mechanism and fittings of Winkhaus, with three rotary flaps (color), two racks, lowers and visors (galvanized steel coated with polyester) Facade block - 120170 (2pcs), side block - 200170, fetches - 12015 (2pcs), 8015 (2pcs), visors - 20015 (2pcs), 8015 (2pcs) 1267.
Balcony Glazing with plastic windows with single-chamber glass windows, with two rotary flaps (color), one rack, lowers and visors. Characteristics are the same Facade block - 200170, side block - 80170, flowed - 20015, 8015, visors - 20015, 8015 739.
TOTAL 5519.
Delivery in Moscow 40.
Total (with a set and set of mounting materials) 5559.
Type of work Scope of work Ral payment, $ Cost, $ Name of materials number Price, $ Cost, $ Total, $
Parishion
Stroke of walls under the wiring 5 pose M. 2.67 13.35 - - - - 13.35
Laying the electrocable, telephone and antenna cable 15 pog. M. four 60. Cable set 15 pog. M. 18.7 40.7 100.7
Corrugated tubes 15 pog. M. 22.
Cement tie device 4,95m2 6,01 29.75 Dry mix "Birsss16" ("Experimental plant dry mixtures", Russia) 297 kg 0.4. 11.88. 41,63.
Device of plasterboard partitions (1CL) 8.05m2 10,66. 85,81 Plasterboard with mounting profiles ("Knauf Gypsum", Russia) 8.05m2 5.5 44.28. 130.
Wall plastered with cement mortar 12,25m2. 8,66. 106.09. Dry mix (Petromix, Russia) 91.9 kg 0.05 4,59. 110,68.
Wall decoration around mirrors with artificial stone 0.8m2. 7,2 5,76. Decorative stone (view "Rocky Mountain", Kamrock, Russia) 0.8m2. 27.97 22.38 28,1
Installation of a staircase plasterboard ceiling 2,7m2 thirty 81. Plasterboard with mounting profiles ("Knauf Gypsum") 2,7m2 eleven 29.7 111.
Preparation of walls under painting (primer and putty) 16,72m2. 5,47. 91,46. Soil Scotte Grund (Beckers, Sweden) 4 L. twenty 22. 113,46.
Putchable "Rotband" ("Knauf Gypsum") 1 bag 2.
Preparation of the ceiling under painting (primer and putty) 4,95m2 6,13 30.34 Soil Scotte Grund. 4 L. twenty 22. 113,46.
Spacure "Rotband" 1 bag 2.
Laying ceramic tiles on the floor 4,95m2 10,66. 52,77 Ceramic Tile Vulcani (Peronda, Spain) 4,95m2 26. 128.7 181,47.
Painting ceiling 4,95m2 3.34 16,53. SCOTTE 3 paint 4 L. 6. 24. 40.5
Painting Walls 16,72m2 2.76 44.64. SCOTTE 3 paint 13.4 L. 6. 80.4. 125.
Installation of built-in luminaires 6 pcs. 6,54. 39.24. Lamps 6 pcs. five thirty 69,2
Installing outlets and switches 3 pcs. 3.34 10.02. Wiring Products Prodax (Hungary) 3 pcs. 10 thirty 40,2
Installation of electrical panel 1 PC. 55. 55. Electrical (PRODAX) 1 PC. 100 100 155.
TOTAL 721,76 TOTAL 1347.05
TOTAL 1982.
CORRIDOR
Cement tie device 7,3m2 6,01 43.9 Dry mix "Birsss16" ("Experimental plant dry mixtures") 297 kg 0.4. 11.88. 55,78.
Stroke of walls under the wiring 5 pose M. 2.67 13.35 - - - - 13.35
Laying the electrocable, telephone and antenna cable 11 pound M. four 44. Cable set 11 pound M. 18.7 40.7 84.7
Corrugated tubes 11 pound M. 22.
Cement tie device 7,3m2 6,01 43,87. Dry mix "Birsss16" 438 kg 0.4. 17.52. 61.39.
Preparation of walls under painting (primer and putty) 20,64m2. 5,47. 112.9 Soil Scotte Grund. 4 L. twenty 22. 113,46.
Spacure "Rotband" 1 bag 2.
Preparation of the ceiling under painting (primer and putty) 7,3m2 6,13 44.75 Soil Scotte Grund. 4 L. twenty 22. 113,46.
Spacure "Rotband" 1 bag 2.
Painting ceiling 7,3m2 3.34 24.38. SCOTTE 3 paint 5.84 L. 6. 35. 59,4.
Painting Walls 20,64m2. 2.76 56.97 SCOTTE 3 paint 16.5 L. 6. 99. 155.97
Laying ceramic tiles on the floor 7,3m2 10,66. 52,77 Ceramic tile Vulcani. 3.65m2 26. 94.9 275,42.
Pirineo Ceramic Tile (Peronda) (3366 and 16,566 cm) 3.65m2 35. 127.75
Installing outlets and switches 3 pcs. 3.34 10.2 Wiring Products Prodax 3 pcs. 10 thirty 40,2
TOTAL 447.09 TOTAL 973,13
TOTAL 1420.
BATHROOM
Cement screed device with waterproofing 8.13m2. 6,01 92.23. Dry mix "Birsss16" ("Experimental plant dry mixtures") 487.8 kg 00.4 19.5 111.7
Installation of the floor electrical heating system 5m2. 19,67. 98.35 Floor electrical heating system (Ceilhit, Spain) 1 set. 153. 153. 251,4.
Installation of plasterboard partitions (2 layers) 4.87m2 11.97 58.39 Plasterboard with mounting profiles ("Knauf Gypsum") 4.87m2 eleven 53,57 112.
Construction of brick masonry with reinforcement 12.78m2. 7.80 99,68. Brick (and mortar) 12.78m2. fifty 639. 738.7
Wall plastered with cement mortar 24, 97m2. 8,66. 216.24. Dry mix ("Petromix") 187.2 kg 0.05 9,36. 225.6
Stroke of walls under the wiring 8 pose. M. 2.67 21,36. - - - - 21,36.
Stroke of walls under pipe wiring 18 pog. M. 2.67 48.06 - - - - 48.06
Laying the electrocable, telephone and antenna cable 15 pog. M. four 60. Cable set 15Pog. M. 1,17 2,55 66,3
Corrugated tubes 15 pog. M. 0.25. 3.75
Laying pipes of water supply and heating 18 pog. M. 5.33 95.94 Metal-polymer pipes 18 pog. M. 6. 108. 203.94
Cement tie device 8.13m2. 6,01 48,86. Dry mix "Birsss16" 487.8 kg 00.4 19,51 68.4
Podium device in the bathroom 0.9M2. 10 nine Dry mixture "Birsss16", Ceramzit 216 kg 00.4 8,64. 17.64
Installing water purification filters 2 pcs. twenty 40. Filters "Rus Filter" (Russia) 2 pcs. thirty 60. 100
Installation of plasterboard box for installation system (fastening of the suspended toilet) 2m2 10.65 21.3. Plasterboard with mounting profiles ("Knauf Gypsum") 2m2 eleven 22. 43.3
Installation of the door block 1 PC. 44.41 44.41 Interroom door Liza (Portadeza, Spain) with accessories 1 PC. 160. 160. 204,4.
Facing wall tiles 29.84m2. 13,33. 397,77 Ceramic Tile Caracas (Marca Corona, Spain) 29.84m2. 19.06. 568.75 966.5
Laying tiles on the floor 6m2. 10,66. 63,96 Ceramic tile Marrakech (Marca Corona) 6m2. 19.06. 114.36 178.3
Installation of suspended ceiling 8.13m2. 9.99 81.22. Plastic panels with a set of fasteners 8.13m2. five 40.65 121.87
Installation of built-in toilet 1 PC. 45. 45. Toilet ESPRIT (Ideal Standard, Germany) with GROHE installation (Germany) 1 PC. 243. 243. 288.
Bath installation 1 PC. 60. 60. Bath Sinergia (Doctor Jet, Russia) 1 PC. 1230. 1230. 1290.
Installation of washbasins 2 pcs. 22.5 45. ESPRIT Sink (Ideal Standard) 2 pcs. 60. 60. 105.
Installation of the shower cabin 1 PC. 85. 85. Showerama shower cabin (IDO, Finland) (9090 cm) 1 PC. 450. 450. 535.
Installation of a cumulative water heater (boiler) 1 PC. 46,63. 46,63. ARISTON WATER HEATER (MERLONI ELETTRODOMESTICI, ITALY) (100 L) 1 PC. 520. 520. 566.7
Installing outlets and switches 5 pieces. 3.34 16,70. Wiring Products Prodax 5 pieces. 10 fifty 66.7
Installation of built-in luminaires 11 pcs. 6,54. 71.94 Lamps 11 pcs. 7. 77. 148.9
TOTAL 1867.04 TOTAL 6479,77
TOTAL 8347.
LIVING ROOM
Brickwork 2,7m2 7.8. 21.06 Brick (and mortar) 2,7m2 fifty 135. 156.06
Cement tie device 18.48m2 6,01 111.06 Dry mix "Birsss16" 1108.8 kg 0.4. 44.35 155.4
Stroke of walls under the wiring 20 pound M. 2.76 53,4. - - - - 53,4.
Strosion of walls under sanitary wiring 3.5 pog. M. 2.76 9.35 - - - - 9.35
Seeling stroke 23.5 M. 1,95 45.83. Stucco "Rotband" 156 kg 0.25. 39. 84,83.
Laying the electrocable, telephone and antenna cable 40 pog. M. four 160. Cable set 40 pog. M. 6.8. 16.8. 176.8.
Corrugated tubes 40 pog. M. 10
Laying plumbing pipes 3.5 pog. M. 4,13 14,46. Metal-polymer pipes 3.5 pog. M. five 17.5 31.96
Drywall niche 3.1m2 25. 77.5 Plasterboard with mounting profiles ("Knauf Gypsum") 3.1m2 eleven 31,1 111.6
Device of the decorative wall of plasterboard 4,95m2 twenty 99. Plasterboard with mounting profiles ("Knauf Gypsum") 4,95m2 eleven 54,45. 153,45.
Leveling Ceilkov 18.48m2 9,33. 172,42. Stucco "Rotband" 138.6 kg 0.25. 34.65 177.04
Alignment of walls 38.7m2 6,65 257.74 Stucco "Rotband" 290.25 kg 0.25. 72.5 330.2
Alignment of window slopes 4.9 M. 8,97 43,95 Stucco "Rotband" 7.5 kg 0.25. 3.75 47.7
Laying ceramic tiles on the floor 18.48m2 10,66. 197. Ceramic tile Pirineo (3366 and 16,566 cm) 18.48m2. 35. 646.8. 843.8
Facing the decorative wall with artificial stone 5m2. fifteen 75. Fake diamond 5m2. 27.97 139.8 214.8.
Preparation of walls under painting (primer and putty) 38.7m2 8,66. 335,14 Soil Scotte Grund. 4 L. twenty 22. 113,46.
Spacure "Rotband" 1 bag 2.
Preparation of the ceiling under painting (primer and putty) 18.48m2 6,13 113.28. Soil Scotte Grund. 4 L. twenty 22. 113,46.
Spacure "Rotband" 1 bag 2.
Painting Walls 38.7m2 2.67 103.33 SCOTTE 3 paint 31 L. 6. 186. 289,3
Painting ceiling 18.48m2. 3.34 61,72. SCOTTE 3 paint 14.8 L. 6. 88.8. 150.5
Installation of built-in luminaires 8 pcs. 6,54. 52,32. Lamps 8 pcs. 7. 54. 106,32.
Installation of heating radiator 1 PC. 42,29 42,29 Radiator Global (Italy) 1 PC. 80. 80. 122,29
Installing outlets and switches 14 pcs. 3.34 46,76. Wiring Products Prodax 14 pcs. 10 140. 186, 8
Installation of split-system 1 set. 162. 162. Split system Mitsubishi Heavy (Japan) 1 PC. 1318. 1318. 1480.
Installation of glass blocks 16 pcs. 4,15 33.2. Colored glass blocks 16 pcs. eight 128. 161,2
Strengthening the opening room 1 PC. 80. 80. Metal design 1 PC. 48. 48. 128.
TOTAL 2390,61 TOTAL 5397,72
TOTAL 7788.
Children's
Stroke of walls under the wiring 15 pog. M. 2.67 40.05 - - - - 40.05
Strosion of walls for pipe wiring 3 pog. M. 2.67 8.01 - - - - 8.01
Seeling stroke 18 pog. M. 1,95 35.1 Stucco "Rotband" 120 kg 0.25. thirty 75,1
Laying electrical wiring, telephone and antenna cable 25 pog. M. four 100 Cable set 25 pog. M. 4.25. 10.5 110.5
Corrugated tubes 25 pog. M. 6.25.
Laying pipe 3 pog. M. 4,13 12.39 Metal-polymer pipes 3 pog. M. five fifteen 27.39
Cement tie device 13,05m2 6,01 78,43. Dry mix "Birsss16" 783 kg 0.4. 31.3. 109.8
Leveling Ceilkov 13,05m2 9,33. 121,76 Stucco "Rotband" 97.9 kg 0.25. 24.5 146.26.
Alignment of walls 36.85m2. 6,65 245. Stucco "Rotband" 276.4 kg 0.25. 69. 314.
Alignment of window slopes 4.57 pound M. 8,97 40.99 Stucco "Rotband" 5 kg 0.25. 1.25 51,2
Installation of plasterboard partitions (2 layers) 5.13m2. 11.99 61,51 Plasterboard with mounting profiles ("Knauf Gypsum") 10,26m2. eleven 112,86. 174.4
Preparation of walls under painting (primer and putty) 48,79m2 8,66. 422,52. Soil Scotte Grund. 4 L. twenty 22. 113,46.
Spacure "Rotband" 1 bag 2.
Preparation of the ceiling under painting (primer and putty) 13,05m2 6,13 80. Soil Scotte Grund. 4 L. twenty 22. 113,46.
Spacure "Rotband" 1 bag 2.
Painting Walls 48,79m2 2.67 130.27 SCOTTE 3 paint 39 L. 6. 234. 364,3.
Painting ceiling 13,05m2 3.34 43,59. SCOTTE 3 paint 10.45 L. 6. 62,7 106,3
Installation of heating radiators 1 PC. 42,29. 42,29. Radiator Global 1 PC. 80. 80. 122.3
Installing the door block 1 PC. 44.41 44.41 Interroom door LIZA with accessories 1 PC. 160. 160. 204,41.
Installing outlets and switches 11 pcs. 3.34 36.74 Wiring Products Prodax 11 pcs. 10 110. 146.7
Parquet works 13,05m2 - - Junckers Parquet Board (Sweden), Deiyera Tree with Styling and Accessories 13,05m2 65. 848.25 848.25
TOTAL 1543.06 TOTAL 3075,89.
TOTAL 4619.
BALCONY
Wall plastered with cement mortar 5,46m2. 8,66. 47,28. Dry mixture "Petromix" 40.95 kg 0.05 2. 49,3
Preparation of walls under painting (primer, putty) 2.46m2 5,47. 13,46. Soil Scotte Grund. 4 L. twenty 22. 113,46.
Spacure "Rotband" 1 bag 2.
Painting Walls 2.46m2. 2.67 6,57 Decorative Plaster "Iris Decor" (Russia-Spain) 4.92 L. 6. 29.5 36.
Cement tie device 1,8m2. 6,01 10.82. Dry mix "Birsss16" 108 kg 0.4. 4,32. 15,14
Laying tiles on the floor 1,8m2. 12 21.6 Borriol ceramic tile (4545cm) (Peronda, Spain) 1,8m2. 24. 43,2 64.8.
Facing wall tiles 4m2. 13,33. 53,32. Borriol ceramic tile (4545cm) 4m2. 24. 96. 149.
The device of suspended ceilings 1,8m2. 9.99 17.98 Set of panels and fastening materials 1,8m2. 10 10 37.98
Installation of built-in luminaires 2 pcs. 6,54. 13.08. Lamps 2 pcs. 7. fourteen 27.08.
Installing outlets and switches 2 pcs. 3.34 6,68. Electric installation AVV 2 pcs. 10 twenty 26,68.
TOTAL 190,79 TOTAL 519,44.
TOTAL 710.
BEDROOM
Brick masonry with reinforcement 3.83m2 7.80 29.87 Brick (and mortar) 3.83m2 fifty 191.5 221,4.
Installation of plasterboard partitions (2 layers) 7m2. 11.99 83.93 Plasterboard with mounting profiles ("Knauf Gypsum") 14m2. eleven 154. 237.9
Installation of a stitched ceiling of plasterboard 2.9m2 twenty 58. Plasterboard with mounting profiles ("Knauf Gypsum") 2.9m2 5.5 4,95 62.95
Stroke of walls under the wiring 15 pog. M. 2.67 40.05 - - - - 40.05
Stroke of walls under pipe wiring 3 pog. M. 2.67 8.01 - - - - 8.01
Seeling stroke 18 pog. M. 1,95 35.1 Stucco "Rotband" 120 kg 0.25. thirty 75,1
Laying electrical wiring, telephone and antenna cable 30 pound M. four 120. Cable set 30 pound M. 5,1 12.6 132.6
Corrugated tubes 30 pound M. 7.5
Laying pipe 3 pog. M. 4,13 12.39 Metal-polymer pipes 3 pog. M. five fifteen 27.39
Cement tie device 13,07m2 6,01 78,56. Dry mix "Birsss16" 784.2 kg 0.4. 31,37. 109.9
Device Podium 2.9m2 10 29. Dry mixture "Birsss16", Ceramzit 696 kg 0.4. 27.8. 56.8.
Leveling Ceilkov 13,07m2 9,33. 121.94 Stucco "Rotband" 97.9 kg 0.25. 24.5 146.26.
Alignment of walls 36,46m2. 6,65 242,46. Stucco "Rotband" 273.45 kg 0.25. 68,36. 310.8.
Alignment of window slopes 6.3 pog. M. 8,97 56,51 Stucco "Rotband" 7.5 kg 0.25. 1.9 58.4
Preparation of the ceiling under painting (primer, putty) 13,07m2 6,13 80,11 Soil Scotte Grund. 4 L. twenty 22. 113,46.
Spacure "Rotband" 1 bag 2.
Preparation of walls under painting (primer, putty) 36,46m2. 5,47. 199.4 Soil Scotte Grund. 4 L. twenty 22. 113,46.
Spacure "Rotband" 1 bag 2.
Painting Walls 30,89m2 2.67 82,48. Paint Scotte3. 24.7 L. 6. 148. 230.5
Painting ceiling 17,26m2. 3.34 57,65 SCOTTE 3 paint 13.8 L. 6. 82.8 140.5
Installation of built-in luminaires 8 pcs. 6,54. 52,32. Lamps 8 pcs. 7. 54. 106,32.
Installation of heating radiator 1 PC. 42,29. 42,29. Radiator Global. 1 PC. 80. 80. 122.3
Installing outlets and switches 11 pcs. 3.34 36.74 Wiring Products Prodax 11 pcs. 10 110. 146.7
Strengthening the opening in the bedroom 1 PC. 130. 130. Metal Schweller (Russia) 6 pog. M. eight 48. 178.
Laying ceramic tiles on the podium 4m2. 12 48. Pirineo ceramic tile (3366cm) 4m2. 37. 148. 196.
Installing the door block 1 PC. 44.41 44.41 Interroom door LIZA with accessories 1 PC. 160. 160. 204,41
Parquet works 13,07m2 000 000 Parquet board (Junckers, Campas Tree (Supplement and Accessories) 13,07m2 75. 980.25 980.25
TOTAL 1689,22 TOTAL 4019,46.
TOTAL 5709.
KITCHEN
Stroke of walls under the wiring 20 pound M. 2.67 53,4. - - - - 53,4.
Stroke of walls under pipe wiring 8 pose. M. 2.67 21,36. - - - - 21,36.
Seeling stroke 28 pog M. 1,95 54.60 Stucco "Rotband" 140 kg 0.25. 1.9 58.4
Laying pipes of water supply and heating 3 pog. M. 5.33 15.99 Metal-polymer pipes 3 pog. M. five 35. 50.99
Electric, telephone and antenna cable gasket 25 pog. M. four 100 Cable set 25 pog. M. 4.25 10.5 110.5
Corrugated tubes 25 pog. M. 6.25.
Cement tie device 10,21m2 6,01 61,36. Dry mix "Birsss16" 784.2 kg 0.4. 31,37. 109.9
Device Podium 6,37m2 10 63.7 Dry mixture "Birsss16", Ceramzit 696 kg 0.4. 27.8. 56.8.
Alignment of slopes 5 pose M. 8,97 44.85 Stucco "Rotband" 6.4 kg 0.25. 1,6 46.5.
Leveling Ceilkov 5m2. 9,33. 46,65 Stucco "Rotband" 42.5 kg 0.25. 10.6 17,25
Alignment of walls 31m2. 6,65 206,15 Stucco "Rotband" 263 kg 0.25. 65.8.
Device of stitched plasterboard ceilings 6,37m2 13,33. 84.91 Plasterboard with mounting profiles ("Knauf Gypsum") 6,37m2 5.5 35. 119.9
Preparation of the ceiling under painting (primer, putty) 10,21m2. 6,13 62,59. Soil Scotte Grund. 4 L. twenty 22. 113,46.
Spacure "Rotband" 1 bag 2.
Preparation of walls under painting (primer, putty) 31m2. 5,47. 169,57 Soil Scotte Grund. 4 L. twenty 22. 113,46.
Spacure "Rotband" 1 bag 2.
Painting ceiling 10,21m2 3.5 35.74. SCOTTE 3 paint 8.2 L. 6. 49,2 84.9
Painting Walls 31m2. 3.34 103,54. SCOTTE 3 paint 24.8 L. 6. 148.8. 252,3
Facing wall tiles 4.2m2 13,33. 55.98 Ceramic Tile St.vincent Glass (Marsa Corona) 4.2m2 19.06. 80. 135.98
Laying ceramic tiles on the floor 10,21m2 12 122,52. Ceramic Tile Atlas (Peronda) 10,21m2 26.75 273,1 395,62.
Installation of heating radiator 1 PC. 42,29 42,29 Radiator Global 1 PC. 80. 80. 122.3
Installing outlets and switches 12 pcs. 3.34 40.08. WHERAGEFORMATION ABB (Germany) 12 pcs. 10 120. 160.
Installation of built-in luminaires 8 pcs. 6,54. 52,32. Lamps 8 pcs. 7. 54. 106,32.
Coloring walls 28m2 1.9 53,2 SCOTTE 3 paint 22.4 L. 6. 134,4. 187.6
TOTAL 1484.26. TOTAL 1791.84
TOTAL 3276.
LOGGIA
Outlet of the walls of plasterboard 8,85m2 6,65 58,85. Plasterboard with mounting profiles "Knauf Gypsum" 8,85m2 5.5 48,75 107.6
Laying thermal insulation on the walls 8,85m2. 1,52. 13.45 Mineral Wat Rockwool ("Mineral Wat", Russia) 8,85m2 four 35.4. 48,85.
Laying thermal insulation on the ceiling 4.19m2. 1,8. 7.54. Mineral wool Rockwool. 4.19m2. four 16,76. 22,63.
The device of suspended ceilings 4.19m2. 9.99 41,85. Set of panels and fastening materials 4.19m2. twenty twenty 61.9
Laying thermal insulation on the floor 4.19m2. 1,4. 5,87. Mineral wool Rockwool. 4.19m2. four 16,76. 22,63.
Cement tie device 4.19m2. 6,01 10.82 Dry mix "Birsss16" 108 kg 0.4. 4,32. 15,14
Facing walls with ceramic tiles 5,18m2 sixteen 82,88. Ceramic tile Borriol 5,18m2 24. 124,32. 207,2
Laying ceramic tiles on the floor 4.19m2. 12 50,28 Ceramic tile Borriol 4.19m2. 24. 100,56. 150.84
Preparation of walls under painting (primer, putty) 2.46m2 8,66. 21.30 Soil Scotte Grund. 4 L. twenty 22. 113,46.
Spacure "Rotband" 1 bag 2.
Painting Walls 2.46m2 2.67 6,57 Decorative stucco "Iris-Decor" 4.92 L. 6. 29.52. 36.
Installing outlets and switches 2 pcs. 3.34 6,68. Electric installation AVV 2 pcs. 10 twenty 26,68.
TOTAL 306.09 TOTAL 812.93
TOTAL 1119.

The editors thanks the manager of the company "Gale" Natalia Koltsov for help in creating materials.

The editors warns that in accordance with the Housing Code of the Russian Federation, the coordination of the conducted reorganization and redevelopment is required.

New life 14298_17

Designer: Olesya Gorbunova