How to mount roof waterproofing with your own hands: Journalist's experience

Anonim

Denis Demeshin is one of those who are used to do everything in life with their own hands. In his 39 years, he reached a considerable: created his own video studio, which works successfully in Ryazan and in Moscow. In the tight schedule of director, producer, correspondent and television operator in one person it is difficult to find time for home trouble. Nevertheless, taking to the partners of the relative, Denis decided to independently replace the roof of the old garage.

How to mount roof waterproofing with your own hands: Journalist's experience 29539_1

How to mount roof waterproofing with your own hands: Journalist's experience

Photo: Tehtonol

Via Waterproofing Flat Roof Tehtonikol Unprofessional builders were able to successfully implement the complex renovation of the old roof. Waterproofing of a flat roofing TechnoNIKOL was created specifically for a private consumer and easy to use. On the laying of self-adhesive material leaves almost three times less than the time compared with the filled materials.

How to mount roof waterproofing with your own hands: Journalist's experience

Photo: Tehtonol

The roof can be covered in 2 days: the first surface is prepared and ground primer, in the second - waterproofing is made.

For Denis, the speed factor turned out to be particularly important - he was engaged in renovation of the roof in breaks, working on the main project of this year, the World Cup. In total, on renovation, the roof of the garage had to be allocated for 3 days. One of them was taken to dismantle and filling a new screed - due to the violation of the technology of laying and the low quality of the old waterproofing, it was not only the top layer, but also the base itself. With the styling of waterproofing managed to meet in one day.

With the waterproofing of a flat roofing Technionol, any owner can mount the roof of the garage, the veranda or other construction buildings are also simple, quickly and on their own. On a flat roof, in contrast to the scope, the precipitates almost do not flow, so the waterproofing layer should be particularly reliable. Progressive material provides the necessary protection.

How to mount roof waterproofing with your own hands: Journalist's experience

Photo: Tehtonol

The light and durable non-tensile base of polyester makes waterproofing of a flat-roofing technical techno-resistant, even in zones of increased loads and deformations. The modified bitumen mixture provides moisture resistance, and the upper protective coating of hydrophobized shale sprinkle protects the bitumen layer from ultraviolet exposure. Accordingly, premature aging will not happen and cracks will not be formed.

In the complex for the roofing device, in addition to the self-adhesive waterproofing material, a bitumen primer and roofing mastic Fixer will also be required.

Calculate the required amount of materials is not difficult. To the length of the garage (along the cornice line) it is necessary to add 1 traffic point meter. Thus, we obtain the number you need to lay the route meters. Then, the width of the garage is divided by 90 cm (including overlap), and we calculate the number of rolls. It is also worth considering the remaining cutting on the length of the trim. If he is big, then correctly calculating its use, you can save and reduce the required number of rolls. Primemer consumption is taken on the basis of 350 gr / m2 surface area, mastic - from 400-500 gr / m2 area of ​​overhearsons and adjoins

Alexey Vorobiev

Federal Technical Specialist Division "Materials for Low-rise Construction" Directions "Bituminous Membranes and Granules" of Technonol Corporation

How to mount roof waterproofing with your own hands: Journalist's experience

Photo: Tehtonol

Waterproofing with flat roofing TechnoNIKOL is easy to use and convenient in transportation. Width 1 meter is optimal for laying. Installation is carried out in several stages:

  1. First of all, it is necessary to properly prepare the basis. It should be clean, smooth and dry. In the case of renovation, the old waterproofing layer is pre-filmed, or, as in the situation of Denis - in addition, a concrete tie is replaced.
  2. Next, the purified base is primed and left by about 12 hours to dry. After that, you can proceed to the installation of the material. Rolls are trying on the place in parallel eternity, cut and roll back to the middle. At the same time, removing the protective film and roll over the base along the base, the laying begins from the bottom-up along the cornese swell.

It is convenient to perform this job together - one unlocks the roll, pulling the film, the second - presses it to the base and smoothes. When installing it is important to correctly arrange transverse adhesions, which are processed by a fiber mastic to improve adhesion. Side adhesions - self-adhesive and should be at least 10 cm, and end - at least 15 cm. The edge of the end roll, as shown in the video, it is necessary to cut into a corner of 10 cm x15 cm to prevent the risk of seam disclosure

Alexey Vorobiev

Good preparation of the foundation and compliance with simple installation rules specified in the instructions for applying on the label will provide durability for many years. At least 20 years, Denis Demeshin can forget about problems with the roof of the garage and focus on other concerns. So, high-quality stories about the life of Ryazan and Ryazantians on federal channels will be more!

Read more