Here are some recommendations that will help readers to prepare for installation, and then evaluate the conscientiousness of the masters.
1. Calculate the dimensions in advance after installing the door
Please note that the width of each box rack is at least 30 mm. Too narrow (less than 800 mm), the openings are inconvenient in everyday life and interfere with emergency evacuation.2. Do not agree to install the door to the wall on the wall
Usually this method does not allow for acceptable burglar resistance and sound insulation. If there is too narrow, it is better to expand it.
3. The direction of opening makes sense to agree with the neighbors
It is necessary that your door in the open position does not block the evacuation paths from the apartments located nearby.4. Before the end of the repair, install the temporary door panel.
If you mount a new door until the end of the repair is completed, order the temporary internal panel from the undemanded MDF and do not install expensive locks immediately. When removing the construction trash or delivery of materials, the finishing panel can damage, and the locks are clogged with concrete dust and fail.
5. Strengthen Opel
When ordering a high-end door of hacking resistance (III and IV classes according to GOST R 51113-97), agree in advance about the strengthening of the day. Without this operation, it will not be able to ensure the required level of protection: when exposed to the door, the wall collapses in the box mounting places
6. Remove the electrocabilities located next to the discovery, or warn the masters about them
7. Make sure that the number of fastening points of the box to the wall was not mee four on the side, if the wall is concrete or brick, and do not six, if foam block. In the first case, a sufficient length of anchors or pins is 100 mm, in the second - 150 mm.8. Taking the work of installers, be sure to check the operation of the locks
Then we open the sash and leave it in this position. If it starts spontaneously open or closed, it means that the box is set crookedly - workers are required to correct the error.
9. Check the tightness of the game
If you doubt the tightness of the action, take the paper strip and catch it with the sash (it is necessary to do in 6-8 places around the perimeter of the door). The strip should everywhere firmly clamped the seal.
Installation of doors (photo)
First of all, the mounting "ears" welded the box. It can be done both in the factory and on the facility.
The box is installed in the opening and check its position with a bubble level.
It is also desirable that the masters have a laser level
With the help of the perforator, deposit places for fastening
Strip fastening pins
If the box is shifted, its position is adjusted
Clean the welding seam with a grinder
Chink pins in the eye
Plumspace
Wipe the box with painting scotch
Mounting clearance
Check the work of the castle