Two-storey house with a total area of 300 m2 for a family of five with a huge open platform before entering the room.
![Windows to the east](/userfiles/56/13676_4.webp)
![Windows to the east](/userfiles/56/13676_5.webp)
![Windows to the east](/userfiles/56/13676_6.webp)
![Windows to the east](/userfiles/56/13676_7.webp)
![Windows to the east](/userfiles/56/13676_8.webp)
![Windows to the east](/userfiles/56/13676_9.webp)
![Windows to the east](/userfiles/56/13676_10.webp)
![Windows to the east](/userfiles/56/13676_11.webp)
![Windows to the east](/userfiles/56/13676_12.webp)
![Windows to the east](/userfiles/56/13676_13.webp)
![Windows to the east](/userfiles/56/13676_14.webp)
![Windows to the east](/userfiles/56/13676_15.webp)
![Windows to the east](/userfiles/56/13676_16.webp)
![Windows to the east](/userfiles/56/13676_17.webp)
![Windows to the east](/userfiles/56/13676_18.webp)
How are ideas born? Went in the air or ripen in creative flour? Perhaps this question is impossible to give an exhaustive answer. But it is known that sometimes the original projects arise in the process of solving the urgent problems when the initial data narrow the framework of the possible and dictate certain conditions for the future at home. That was how it was in this case.
The first problem with which I had to face the architect concerned the non-standard configuration of the site itself. With his wrong form, he reminds something like the letter "G": narrow on the part of the driveway and strongly elongated, at the end of the plot expands. Vilation Places for a residential building The author of the project stopped at an optimal version: a platform in the depths of the territory was reserved under construction, in its widest part. In addition, in the process of designing the house, it was necessary to take into account the fairly close arrangement of neighboring buildings. The result is the structure turned out to be "open" only towards the garden, and from three other parties facing neighboring fences, the walls were made practically deaf. However, thanks to the large windows, the windows, the premises do not have a lack of daylight, and the successful orientation of the building to the East allows the sun to reign in its inner space from the early morning and almost until noon.
The building consists of three gradually decreasing volumes, each of which has a separate roof. This made it possible to make the facade pattern with light and elegant. The rapid design of the pitched roof is made of glued bar. The thing is not a thoughtful overlap, so the roof is insulated by the Mineral Wool Paroc (Finland) thickness 200mm. Punching of roofing used KatePal bitumen tile (Finland).
The internal layout of the building is organized so that each of the three architectural parts performs its function. The highest two-storey part of the house can be called a master. Here are: on the first floor, the living room, on the second-bedroom of the parents. Also, also a two-story, but less than high part on the first floor there is a settling kitchen and boiler room, and on the second children's and nanny room are placed. And finally, in a one-story part, located perpendicular to relatively main volume of the building, two more isolated rooms for older children are equipped. Thus, all family members have their own sovereign territory.
The arrangement of the Big House is sometimes more trouble than the organization of the small. In order to stay in the spacious room, it is comfortable, it is necessary to split the interior on a commensurate person volumes. In the case, the problem was the living room, the area of which is about 60m2. The easiest technique that allows you to organize space, is considered to be a muddle with a soft furniture, they are used in the home theater zone. In this case, not only the texture can be actively operating, but also color. So, the dining room is accented with a contrasting black tone of the table and chairs on the background of light walls, which localizes this area of the interior. A more radical way to increase or decrease the level of the floor in any part of the spacious room (device of various podiums, Lesteno IT.P.). This technique is used in the fireplace, where the floor is reduced by 60cm. As a result, a separate cozy space was formed around the focus. Interestingly, the recess is made with such a calculation to correspond to the height of the sofas selected by the owners specifically for this zone.
Living room is the largest house room (58.9M2). Ito in itself considerable space is still visually expanding windows-showcases overlooking the terrace. As a result seems like wooden flooring is a natural continuation
If the dining area is equipped in the living room, designed for festive dinners and reception, then for everyday trapes, a spacious kitchen has a large dining table. Located on two walls kitchen furniture. Strict geometric shapes (SCIC, Italy) with built-in household appliances made it possible to make the interior more concise. The floor of the kitchen is lined with light brown ceramic tiles, selected in the tone of the parquet board, which is laid in the residential premises. From the kitchen you can go into the technical room where the gas boiler and the Ferroli boiler are located. In addition, in the boiler room you can get from the street, through a black move.
Since the country house was intended, first of all, for relaxation in nature, the architect Svetlana Nikolaeva paid special attention to the organization of platforms outdoors. It was for this purpose that the terrace was designed before entering the building. The platform with a wooden flooring is quite spacious in order for not only the garden table and chairs, but also a chaise longue, children's swing, and there is still a place for moving games. Adla picnic in the garden provides a gazebo from glued timber. Thanks to the decoration of the brick, it is easily turning into a "summer cafe", where the treat is preparing directly on the open fire.
The enlarged calculation of the cost of works and materials on the construction of the house with a total area of 300m2,
Looking like presented
Name of works | Units. change | Number of | Price, $ | Cost, $ |
---|---|---|---|---|
Foundation work | ||||
Takes up axes, layout, development and recess | m3. | 90. | eighteen | 1620. |
Foundation base device | m2. | 200. | 3. | 600. |
Device of the foundations of ribbon reinforced concrete | m3. | 78. | 60. | 4680. |
Waterproofing horizontal and lateral | m2. | 280. | four | 1120. |
TOTAL | 8020. | |||
Applied materials on the section | ||||
Concrete heavy | m3. | 78. | 62. | 4836. |
Crushed stone granite, sand | m3. | 36. | 28. | 1008. |
Sawn timber | m3. | one | 110. | 110. |
Bituminous polymer mastic, hydrohotelloisol | m2. | 280. | 3. | 840. |
Rental of steel, fittings, knitting wire | T. | 1.5 | 610. | 915. |
TOTAL | 7710. | |||
Walls, partitions, overlap | ||||
Masonry of external and internal bearing walls of bricks | m3. | 126. | 32. | 4032. |
Brick facing facial with extender | m2. | 280. | eighteen | 5040. |
Devices of reinforced brick partitions | m2. | 103. | 10 | 1030. |
Installation of reinforced concrete floors | m2. | 398. | nine | 3582. |
Laying plates of balconies, visors | set | - | - | 300. |
TOTAL | 13990. | |||
Applied materials on the section | ||||
Ceramic brick, concrete jumpers | thousand pieces. | 48.4 | 190. | 9196. |
Brick ceramic facing | thousand pieces. | 15.5 | 320. | 4960. |
Plate of overlap of reinforced concrete | m2. | 398. | sixteen | 6368. |
Rental of steel, steel hydrogen, fittings | T. | one | 390. | 390. |
Masonry solution and other materials | set | - | - | 1600. |
TOTAL | 22520. | |||
Roofing device | ||||
Installation of the rafter design with clamp | m2. | 210. | 12 | 2520. |
The device of the calane vaporizolation | m2. | 210. | 3. | 630. |
Bitumen Tiles Coating Device | m2. | 210. | 10 | 2100. |
Enderbutting of eaves, soles, device of frontones | m2. | 40. | eighteen | 720. |
Installation of the drain system | rm. M. | 37. | sixteen | 592. |
TOTAL | 6560. | |||
Applied materials on the section | ||||
Lumber (laminated timber) | m3. | nine | 400. | 3600. |
Sawn timber | m3. | 3. | 120. | 360. |
Stove | m2. | 210. | 2.6 | 546. |
Katepal roofing | m2. | 210. | nine | 1890. |
Steam, wind and waterproof films | m2. | 210. | 1,8. | 378. |
Drain system | set | - | - | 900. |
TOTAL | 7680. | |||
Warm outline | ||||
Insulation of coatings and overlaps insulation | m2. | 210. | 2. | 420. |
Filling opening windows and door blocks | m2. | 79. | 35. | 2765. |
TOTAL | 3190. | |||
Applied materials on the section | ||||
Insulation Paroc. | m2. | 460. | 3. | 1380. |
Fencing structures from "warm aluminum" (Germany) | m2. | 49. | 860. | 42 140. |
Door blocks | set | - | - | 3800. |
TOTAL | 47320. | |||
Engineering systems | ||||
Device fireplace | set | - | - | 2800. |
Plumbing and electrical work | set | - | - | 4700. |
TOTAL | 7500. | |||
Applied materials on the section | ||||
Gas boiler Ferroli. | PC. | - | - | 1000. |
Fireplace supra. | set | - | - | 2800. |
Plumbing and electrical equipment | set | - | - | 8400. |
TOTAL | 12200. | |||
FINISHING WORK | ||||
Finishing works (plastering, painted, facing, assembling, carpentry and carpentry) | set | - | - | 43 600. |
TOTAL | 43600. | |||
Applied materials on the section | ||||
Glk, staircase, ceramic tile, decorative stone, floor coverings, decorative elements, dry mixes, paints, varnishes, protective compounds and other materials | set | - | - | 52700. |
TOTAL | 52700. | |||
Total cost of work | 82900. | |||
Total cost of materials | 150100. | |||
TOTAL | 233000. |