3 main rules that need to be performed when delivering concrete to a construction site

Anonim

Delivery of concrete to the construction site is carried out with the help of concrete mixers. It is important to think over each stage of work in advance, providing the necessary conditions for the technique.

3 main rules that need to be performed when delivering concrete to a construction site 9203_1

3 main rules that need to be performed when delivering concrete to a construction site

1 Prepare a parking lot

Requirements for the discharge site:
  • solid coating;
  • minimum dimensions - 6 x 8 m;
  • bias - no more than 5%;
  • In the unloading zone there should be no power lines, as well as trees that impede work.

2 Think the route

The concrete mixer route should be thought out in advance, given all the obstacles that can meet on the way. If you need to overcome the arches or entry with height limitations, dimensions or load, you need to inform the company to operator. In this case, the technique will be selected with the most convenient for transportation with indicators.

It is also important to objectively evaluate the quality of the road surface: if the technique obesomes in the mud, there will be a lot of problems. It is much easier and more profitable to calculate everything in advance.

Mass and dimensions of concrete mixers
Volume, m3) Height (m) Width (m) Length (m) Number of axes Machine Machine (T)
four 3,4. 2.5 7.35 2. 10
five 3.5 2.5 7.4-8 3. 12
6. 3.6 2.5 7.8-8.5 3. 11.9-13.5
7. 3.6-3,75 2.5 8.2-8.8. 3. 12.2-13.9
eight 3.7-3,85 2.5 8.4-9 3. 12.8-15
nine 3.7-3,95 2.5-2.55 8.5-9,2 3. 13-15
10 3.8-4 2,55 9.3-9.45 four 15.3-17,2
eleven 3,78. 2,55 9,78. four 16.6
12 3.82-3,95 2,55 9.94-10,36 four 16,7-19

Another important point that needs to be considered - the peculiarities of the road in a particular area. For concosses, both for cargo machinery can be prohibits for motion for any roads.

Look for concrete manufacturers as close as possible to the construction site, since long-term transportation can adversely affect the quality of concrete.

3 Take care of the car wash

After unloading the concrete mixer must be rinsed. To do this, you will need not so much water, but together with it, after cleaning, part of the concrete will fall out, which will later grab, spoiling the landscape. About where to merge liquid, the customer must be taken care of in advance.

The article was published in the journal "Tips of Professionals" No. 3 (2019). You can subscribe to the printed version of the publication.

Read more