Painter

Anonim

House of 183 m2. In the process of reconstruction, the construction has acquired not only the second floor, but also a high porch and a spacious terrace balcony

Painter 12884_1

Painter

Painter
The high porch with carved railing, as well as the elegant balcony terrace decorated the house, giving the facade of unusualness. Protected from bad weather with a wide range of roof terrace, which can be passed from the living room of the second floor, is a great place to stay. From here there is a picturesque view of the ancient city of Myshkin
Painter
Over time, a log cabin on a high base has grown next to the house. The house and bath combined the gallery, in the lower level of which all sewer and water-wire pipes hid. The wooden wall of the gallery has become a kind of screen hiding internal life from prying eyes
Painter
The spacious porch, erected before entering the house, can serve as a great place to relax, especially since the overlap of the balcony-terrace of the second floor is protected from the weather. Bright painting of wooden floating overlap makes the inner space of the porch look like a fabulous tent

Painter

Painter

Painter
Bright paintings with a colored carpet cover the frontones of the house, as well as the wooden stroke of the terrace over the porch and the bearing of the carport over the terrace itself. In the corners of the building there are drawn spacing columns, painted under marble
Painter
Dammed from time to time log walls with their rude texture were left without decorative sheat. Due to this, it was possible to preserve the unique color of the real Russian wooden house
Painter
Numerous objects of life and tools of labor-braid, rakes, grade - became full inhabitants of the "new" house, an integral part of his image
Painter
The space of the public zone of the first floor is compositely built around a large Russian oven located in the heart of the room.
Painter
The covered gallery connecting the house and the bath, from time to time turns into the original exhibition pavilion, on the walls of which places a variety of exhibits: works of art, vintage household and clothing

Painter

Each house has its own story. It is a short, simple, other, long, filled with events. The history of the building, which will be discussed, has more than a hundred years. This, however, does not prevent him and today to live full and, I must say, very active creative life.

In the glorious city of Myshkin, in its very center, it is worth a high wooden building, which the townspeople are not called the "house of fairy tales". It has its own reason. His story really began a long time ago. Sometime, a commodity two-storey log house belonged to the city postmaster of a large family. Years passed, the owners changed, the house itself was changed. Over time, whether the considerations of saving, or because of the windy, the second floor was dismantled, building a new roof. In the current form, the building existed until the current owner of Vladimir Shukhov attracted the attention of its own owner, the great-known Russian engineer V.G. Shukhov. To be in the Myshkin in cases of Vladimir accounted for quite often. The beauty of the local locomotiveness of nature, the magnifier of the Volga expanse, surprised the beauty of the local locomotiveness of the nature of the nature of the Volga expanse: the ideal place for recreation and creativity. In the event of the next visit, the idea was born here more seriously: buy a house where you could stop, coming to the city, as well as relax with your family invited to visit with the word, to organize something like creative cottage. Yes, and the place there was a very suitable, large old log house in a quiet, very green picturesque center of the town.

New life of old walls

The building, estimated not one dozen years, of course, needed a substantial reconstruction. Moreover, one of the important tasks was to preserve the unique aura of the former buildings, its history, character. Works began with the urgent - with replacing the foundation. Raising the log house with the help of jacks, the former foundation was dismantled and replaced with a new monolithic reinforced concrete tape type. The total height of the foundation part was 1M, of which 0.5M-raven sand, 0.5 m-reinforced concrete (the use of such a system was made possible thanks to a relatively small weight of a wooden design). The base part of the building was also made from a monolithic reinforced concrete, ensuring the capole with horizontal waterproofing using a rubberoid.

Painter

Painter

Painter

In order not to destroy the integrity of the image of an old wooden house, the construction windows made double, with simple wooden frames and ordinary window glass. Attached from the old building, platbands with a thin carved pattern have become the best framing for them.

On the manufactured base, the old chub walls were watered, isolated from massive crash logs. The wood was treated with anti-view and antiseptic compositions of Tikkurila (Finland). Second floor-frame. A layer of insulation in frame panels - 200mm (mineral wool isover, Finland). From the side of the inner premises, film vaporizolation was laid, from the street, wind insulation (pergamine). In order to "coordinate" an externally old and new parts of the building, the house was fully chosen by a pine board with a quarter of a wooden crate, the ventilation gap of 40mm was left between windproofing and outer trim.

The work of the reconstruction of the construction acquired not only the second floor, but also a high porch and a spacious terrace balcony. A tree for them was chosen not simple: the urban office was dismantled to the building materials, which came to the dilapidation. As a result, thanks to the use of well-dried wood, it was possible to avoid difference in the shrinkage of the old and new parts of the building.

Colorful outfit

Above each part of the house, which has in terms of the form of the letter "T", was built with a double roof, carefully insulated with its mineral wool ISOVER (250mm). The roof was made of a wavy slate corresponding to the "historical" nature of the construction. Achloba Gray corrugated sheets did not look too boring, they were painted in green.

Did not leave without colorful design and wooden walls. Actually, because of him the building and gained its local title: "House of fairy tales". AVSE Because settled on the walls of Russian folklore characters: lions, mermaids, bears and whale, horned deer and, of course, the omnipresent mouse. Murals made in the style of Russian Lubka, professional artists created by the primed surface with the help of paints for facade works Tikkurila.

For rest and creativity

The internal layout is organized in such a way that the construction can be as fully as possible with its assignment - to be a place to rest and creative communication. Most of the first floor occupies a spacious room, it can serve as a living room, and a dining room. A special flavor gives this part of the house a Russian oven, folded in the center of the room on the site of an old stove, disassembled due to unfortunate. The furnace is faced with real old tiles, which long hold heat, and hangs almost the entire amount of the first floor. Audobic laying upstairs is another sleeping place for guests. And, of course, in the stove you can prepare delicious dishes. In addition, in the right wing of the building there is a separate kitchen room. The gas stove and the oven are installed here.

A second floor center is reserved below the recreation area. Thanks to a considerable area and good light, this upper living room can be both studio workshop and the exhibition hall. The surrounding two top-level rooms are equipped with bedrooms. Interestingly, furniture and for residential premises, and for public zones were picked up ancient. Often, the objects of the situation moved here from friends and acquaintances. Carved buffets, dressers, iron beds, which did not fit into modern interiors of urban apartments, found a new life here, creating a unique atmosphere of an old mansion with a long and interesting story.

Explanation of the first floor

Painter
Plan of the first floor 1. Single ................................... 23,1m2

2. Guest-dining room ......... 34,3m2

3. Summer hall .......... 11,4m2

4.Sanzel .................... 1,6m2

5. Sew .................... 2.8m2

6.Kuhny ......................... 23,4m2

Explanation of the second floor

Painter
Plan of the Second Floor 1. Friend .................... 17,3m2

2. Guest-Studio ............. 58m2

3. Split .................. 15.8M2

Technical data

Total area of ​​the house .............. 183,3m2

Designs

Building type: log

Foundation: Monolithic reinforced concrete ribbon type

Walls: First Floor-Tesane Log; Second floor - Wooden frame structures, film vaporizolation, thermal insulation - mineral wool ISOVER (200mmm), wind insulation - pergamine, outer casing - pine board, inner cover- lining

Overlap: Wooden, thermal insulation - mineral wool Rockwool (Denmark) thick 100mm

Roof: Scope, Stropylene design, Wooden rafters, Steam barrier film, insulation- mineral wash ISOVER (250mm), waterproofing - waterproofing membrane, roofing slate

Windows: Double Wooden with Glass

Life support systems

Power Supply: Municipal Network

Water and gas supply: centralized

Heating: Gas Copper Protherm (Czech Republic), Aluminum Radiators Global (Italy), Russian oven

Hot Water Supply: Electrolux Elector (Sweden)

Sewerage: centralized

Additional systems

Oven: Russian

Interior decoration

Walls: Pine Lining, Toning impregnation Tikkurila

Floors: Pine board

Ceiling: Pine board, lining

Furniture: Antique

Plumbing: IDO (Finland)

The enlarged calculation of the cost * home improvement with a total area of ​​183m2, similar to the submitted

Name of works Number of price, rub. Cost, rub.
Preparatory and Foundation Works
Dismantling and preparatory work set - 214,000
Takes up axes, layout, development and recess 36m3. 590. 21 240.
Sand base device 12m3 390. 4680.
Device of the foundations of ribbon reinforced concrete 13m3 4400. 57 200.
Waterproofing horizontal and lateral 42m2. 380. 15 960.
Other works set - 42 500.
Total 355 580.
Applied materials on the section
Concrete heavy 13m3 3900. 50 700.
Sand 12m3 450. 5400.
Hydrosteclozol, Bituminous Mastic 42m2. - 12 180.
Armature, Formwork Shields and Other Materials set - 72 600.
Total 140 880.
Walls, partitions, overlap, roofing
Build walls and partitions from logs 24m3. 3800. 91 200.
Assembling frame outdoor walls and internal partitions 110m2. 750. 82 500.
Build overlap with laying beams 183m2 520. 95 160.
Assembling roof elements with crate device 180m2. 610. 109 800.
Isolation of walls, overlap and coatings insulation 473m3 90. 42 570.
Hydro and vaporizoation device 473m2. 40. 18 920.
Cabinet terraces, porch set - 172,000
Filling the openings by window blocks set - 55 900.
Swimming Fixture, Installation of Decorative Wooden Parts set - 285,000
Wall sheath with planed boards 110m2. 470. 51 700.
Device coating from slate 180m2. 360. 64 800.
Other works set - 112 000
Total 1 181 550.
Applied materials on the section
Sawn timber 25m3. 6700. 167 500.
Interwidden insulation, bent, fasteners set - 24,600
Profiled board 110m3. 320. 35 200.
Steam, wind and waterproof films 473m2. - 16 560.
Mineralovate insulation 473m2. - 50 200.
Wavy slate 180m2. 170. 30 600.
Wooden window blocks set - 165 300.
Other materials set - 184,000
Total 673 960.
Engineering systems
Furnace device set - 142 000
Electrical and plumbing work set - 690,000
Total 832,000
Applied materials on the section
Dual-circuit gas boiler (Czech Republic) set - 57 900.
Water heater (Sweden) set - 12 500.
Plumbing and electrical equipment set - 985,000
Total 1,055 400.
FINISHING WORK
Ceiling liner lining set - 76 800.
Corps of wooden chopped walls set - 17 600.
Device of board coatings with installation of plinths 183m2 640. 117 120.
Antisepting ready-made compositions set - 63 900.
Other works set - 685,000
Total 960 420.
Applied materials on the section
Paullet board (pine), lining, staircase, door blocks, decorative elements, varnishes, paints, impregnation, dry mixes and other materials set - 2,520,000
Total 2,520,000
* - the calculation is made on the averaged rates of construction firms Moskva without taking into account the coefficients